Turrum Oil and Gas Field
Revision as of 07:35, 29 November 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Exxon * Country: Australia * Location: * Production start: * Partners: BHP Billiton * Type: Oil / Gas * Estimated Reserves: one trillion cub...")
Summary Information
- Operator: Exxon
- Country: Australia
- Location:
- Production start:
- Partners: BHP Billiton
- Type: Oil / Gas
- Estimated Reserves: one trillion cubic feet of gas and 110 million barrels of oil and natural gas liquids
- Production Volume:
+++ Description
- The Turrum field is located 42 kilometres from shore in about 60 metres of water
- The development consists of a new platform, Marlin B, linked by a bridge to the existing Marlin A platform.
- Marlin A was upgraded to accommodate the bridge and new equipment.
- Gas is to be processed at the Longford Gas Conditioning Plant
+++ Contractors
- **McDermott:** EPCI, transportation, hook-up and commissioning of Jackets, piles, topsides, subsea facilities, pipelines, umbilicals
+++ History
- 2008 - Final investment decision made
+++ Geology
+++ Links