Turkmenbashi Refinery

From A Barrel Full
Revision as of 06:43, 30 March 2020 by Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Website: Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan Capacity: million tons/annum & bbl/day Nelson Complexit...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information Ownership: Website: Location: Turkmenbashi (formerly Krasnovodsk), a Caspian sea port, Turkmenistan Capacity: million tons/annum & bbl/day Nelson Complexity: Refining Depth: Refining Units Atmospheric Distillation Vacuum Distillation Fluidised Catalytic Cracker Delayed Coker - 17,600 bpd Gas concentration section with capacity of 4140 TPD Amine Treating & regeneration section with capacity of 11600 bpd (LPG) and 210 TPD (Sulfur) LPG Merox process unit with capacity of 11600 bpd Gasoline Merox process unit with capacity of 23300 bpd Terminal Capacity Crude Oil: Refined Products: Crude Supply - Products Produced LPG, Gasoline Ongoing Projects For details see Turkmenbashi Refinery Project The refinery is planning a major upgrade project. The aim of this project is to install at the existing Turkmenbashi Refinery, a residue fluid catalytic cracking complex and a polypropylene production unit, which will produce gasoline, LPG, polypropylene, and fuel oil by cracking and reforming the atmospheric residues produced by this refinery. Other Information - History 1999 - Reconstruction of catalytic cracking plant 2000 - Renovation of vacuum plant 2001 - Revamp of base oil plant 2002 - Reconstruction of Primary oil processing Plants 2002 - Foster Wheeler awarded Coker revamp contract 2010 - Commissioning of Delayed Coker 2015 - Neste Jacobs awarded train loading facility contract

Links

  1. Foster Wheeler Delayed Coker Revamp
  2. Turkmenbashi Refinery DCU Project
  3. Emerol Projects
  4. Gasoline Production Unit Project Turkmenbashi Refinery
  5. EIED Oil And Gas Projects
  6. Foster Wheeler Delayed Cokers
  7. Uhde Downstream Oil And Gas Projects
  8. Feed Contract Awarded to Foster Wheeler for Turkmenistan Refinery Revamp
  9. Neste Jacobs to Engineer Rail Loading Facility for Turkmenbashi Refinery in Turkmenistan