Tuna Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: ENI
- Country: Egypt
- Location: Temsah Concession, Offshore
- Production start: 2010
- Partners: Shell
- Type: Gas
- Estimated Reserves:
- Production Volume: 4.5 million scm/day of gas
+++ Description
- The project consists of a 4 leg platform in approximately 80 meters of water, three producing wells and 14 Km of 24" pipeline connecting to existing infrastructure.
+++ Contractors
- **Enppi, Technomare and Petrojet:** Detailed engineering, procurement services for subsea pipeline and material supply of topside facilities
- **Micoperi:** Tuna platform transportation and installation
- **Seaway Heavy Lifting:** Tuna Jacket and Foundation Piles
- **FoundOcean:** Grouting
+++ History
- 2010 - First gas produced
- 2015 - Shell acquired BG Group and became a partner
+++ Geology
+++ Links