Difference between revisions of "Tucker Oil Sands Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Husky * Country: Canada * Location: Cold Lake, Alberta * Production start: 2006 * Partners: * Type: Bitumen * Estimated Reserves: * Producti...") |
Abarrelfull (talk | contribs) |
||
Line 21: | Line 21: | ||
* 2004 - Construction began on the project | * 2004 - Construction began on the project | ||
* 2006 - The official opening of the project | * 2006 - The official opening of the project | ||
+ | * 2020 - Husky and Cenovus merged | ||
+ | * 2021 - Cenovus sold the field | ||
+++ Geology | +++ Geology | ||
Line 29: | Line 31: | ||
# [http://killajoules.wikidot.com/archive:husky-announces-tucker-oil-sands-project-completion Husky Announces Tucker Oil Sands Project Completion] | # [http://killajoules.wikidot.com/archive:husky-announces-tucker-oil-sands-project-completion Husky Announces Tucker Oil Sands Project Completion] | ||
# [http://killajoules.wikidot.com/archive:husky-energy-celebrates-its-inaugural-oil-sands-proj Husky Energy Celebrates its Inaugural Oil Sands Project] | # [http://killajoules.wikidot.com/archive:husky-energy-celebrates-its-inaugural-oil-sands-proj Husky Energy Celebrates its Inaugural Oil Sands Project] | ||
+ | # [https://abarrelfull.blogspot.com/2022/06/cenovus-and-husky-combine-to-create.html Cenovus and Husky Combine to Create a Resilient Integrated Energy Leader] |
Revision as of 08:04, 7 November 2023
Summary Information
- Operator: Husky
- Country: Canada
- Location: Cold Lake, Alberta
- Production start: 2006
- Partners:
- Type: Bitumen
- Estimated Reserves:
- Production Volume:
+++ Description
- The Tucker Oil Sands Project is an integrated development and is located in close proximity to Husky's existing heavy oil pipeline infrastructure. The product will be blended with a diluent to be transported to Lloydminster Heavy Oil Upgrader, Saskatchewan.
- During the 35 year life of the project, Husky expects to produce approximately 350 million barrels of bitumen
+++ Contractors
- **Aker Solutions:**
- 1 FWKO Vessel c/w desand system; insulation; sample pump; sample cooler; instruments & platform - 13-10" OD x 100
- 2 Treater Vessel c/w desand system; 2 transformers; insulation; sample box; sample cooler & sample pump - 13-10" x 80
+++ History
- 2004 - Construction began on the project
- 2006 - The official opening of the project
- 2020 - Husky and Cenovus merged
- 2021 - Cenovus sold the field
+++ Geology
+++ Links