Troll Oil Pipeline

From A Barrel Full
Revision as of 11:07, 6 January 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Troll Oil and Gas Field * Destination: Mongstad, Norway * Ownership: * Website: * Length: 165 kilometres ( miles) * Capacity: barrels of...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Source: Troll Oil and Gas Field
  • Destination: Mongstad, Norway
  • Ownership:
  • Website:
  • Length: 165 kilometres ( miles)
  • Capacity: barrels of oil per day
  • Crude Type: Troll

+++ Brief Description

* Troll Oil Pipeline I is 16" diameter, 85 km length and has transport capacity 42,500 m3/day from Troll B Platform
* Troll Pipeline II is 20" diameter, 80 km length and has transport capacity 40,000 m3/day from Troll C Platform


+++ Pipeline Status

  • In operation

+++ History

  • 1995 - Troll Pipeline I completed
  • 1999 - Troll Pipeline II completed

+++ Other Information

  • -

+++ Links

  1. Troll oil for 20 years