Difference between revisions of "Transcanada Canadian Mainline Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 11: Line 11:
 
=== Details ===
 
=== Details ===
 
* The Canadian Mainline carries natural gas from the Western Canada Sedimentary Basin (WCSB) to Ontario and beyond to the Québec/Vermont border and connects with other natural gas pipelines in Canada and the U.S.
 
* The Canadian Mainline carries natural gas from the Western Canada Sedimentary Basin (WCSB) to Ontario and beyond to the Québec/Vermont border and connects with other natural gas pipelines in Canada and the U.S.
* It has interconnects with a number of pipelines including [[Empire Gas Pipeline]], [[Great Lakes Gas Transmission Company GLGT Pipeline]], [[Iroquois Gas Pipeline]]
+
* It has interconnects with a number of pipelines including [[Empire Gas Pipeline]], [[Great Lakes Gas Transmission Company GLGT Pipeline]], [[Iroquois Gas Pipeline]] and [[Trans Québec and Maritimes Pipeline (TQM)]]
 
* Gas is supplied by the [[Nova Gas Transmission Gas Pipeline]]
 
* Gas is supplied by the [[Nova Gas Transmission Gas Pipeline]]
 
* It connects with the [[Dawn Natural Gas Hub]] in Ontario
 
* It connects with the [[Dawn Natural Gas Hub]] in Ontario

Revision as of 08:15, 20 September 2023

Summary Information

  • Source: Alberta/Saskatchewan border
  • Destination: Québec/Vermont border
  • Ownership: TransCanada
  • Website: https://www.tcenergy.com/
  • Length: 14,082 km (8,750 mile)
  • Capacity: per day
  • Status: Operating

Details

History

  • 1997 - System Expansion completed
  • 2007 - 860 kilometres (530 miles) between Burstall, Saskatchewan and Carman, Manitoba were transfered to become part of the [[[Keystone Pipeline]]]
  • 2008 - Eastern Service Expansion & Chippawa Expansion completed
  • 2013 - NEB Fixes Multi-Year Tolls for TransCanada Mainline

=== Other Information

  • -

Links

  1. TransCanada Gas Pipelines
  2. EIA Natural Gas Pipeline Projects 1996-1999
  3. EIA Natural Gas Pipeline Projects 2000-2009
  4. National Energy Board approves TransCanada - Keystone Facilities Transfer
  5. NEB Fixes Multi-Year Tolls for TransCanada Mainline - Decision enables the Mainline to Remain Competitive