Trans-Saharan Gas Pipeline Project
Jump to navigation
Jump to search
Summary Information
- Source: Nigeria
- Destination: Algeria
- Ownership: NNPC / Sonatrach
- Website:
- Length: 4,300 kilometres (2,565 miles)
- Capacity: 18-25 bcm/year
+++ In Brief
- The 4,300 km pipeline is proposed under the NEPAD initiative to connect to gas resources in Nigeria and Algeria and transport them to consumers accessible from the pipeline along its route and at its terminal point on the Mediterranean coast of Algeria.
+++ The Route
- The pipeline will run from the oil & gas fields in South Nigeria, across Niger up to the coast of Algeria
+++ Pipeline Status
- Planned
+++ History
- 2002 - a Memorandum of Understanding has been signed between Sonatrach and the Nigerian National Petroleum Company (NNPC) concerning the feasibility study of the TSGP
- 2005 - Sonatrach and NNPC granted the British company Penspen/IPA the feasibility study of the TSGP
+++ Other Information
- A feasibility study has been performed by Penspen
- Political rivalries between Nigeria & Niger are causing delays
+++ Links