Tractebel Engineering LNG References

From A Barrel Full
Jump to navigation Jump to search

Introduction

  • Tractebel Engineering is a global engineering consultancy company with more than 100 years of expertise in energy and infrastructure projects. Tractebel Engineering’s services cover the whole lifecycle of these projects, from feasibility studies to decommissioning.

References

Europe

  1. Porto Empedocle LNG Terminal
    • Italy
    • ENEL
    • Assistance to ENEL to build up a contracting strategy and to identify the potential scope breakdown
    • 2012
  2. **Sines LNG Terminal**
    • Portugal
    • Transgas Atlantico
    • Optimisation and ship loading studies
    • 2012
  3. Fos Tonkin LNG Terminal Renovation
    • France
    • Elengy
    • Feasibility study for the capacity extension of the LNG terminal
    • 2012
  4. Fos Cavaou LNG Terminal
    • France
    • ELENGY
    • Feasibility study for expansion and new tank installation
    • 2012
  5. Sines LNG Terminal
    • Portugal
    • Transgas Atlantico
    • Complete EPC turnkey project for a 900 000 Nm³/h LNG terminal with unloading jetty and two 120.000 m³ storage tanks
    • 2000-2004
  6. Fluxys Zeebrugge LNG Terminal
    • Belgium
    • Distrigaz
    • EPCM for installation of truck loading bays in the existing terminal
    • 1993 / 1985
  7. Revithoussa LNG Terminal
    • Greece
    • Preliminary engineering studies were required to submit a turnkey proposal or the terminal, with the exception of the storage tanks' construction
    • (each tank 65.000 cbm). Send out capacity = 500 million cbm/y.
    • 1993

Asia

  1. Chhara LNG Terminal
    • India
    • HCPL
    • Detailed feasibility study for LNG terminal in Chhara
    • 2012
  2. Dabhol LNG Terminal
    • India
    • GAIL
    • Plant inspection before 1st ship unloading in March 2012
    • 2012
  3. Gangavaram Lng Terminal
    • India
    • Petronet LNG Ltd
    • Comparison FSRU/FSU and feasibility study for a LNG import terminal on the Eastern Coast in Gangavaram
    • 2012
  4. Mundra LNG Terminal
    • India
    • Hindustan Petroleum
    • Consultancy services for the preparation of a detailed feasibility report for a new LNG import terminal at Mangalore and Mundra and associated cross country pipeline from Mundra to Delhi and Mangalore to Chennai via Bangalore
    • 2005
  5. Chennai LNG Terminal
    • India
    • Indian Oil Corporation
    • Consultancy services for the preparation of a detailed feasibility report for a new LNG import terminal on the South-East coast of India at Ennore, Tamil Nadu
    • 2005
  6. Tongyoung LNG Terminal
    • Korea
    • Korea Gas Corporation (KOGAS)
    • Turnkey project for two 17 t/h recondensors
    • 2001
  7. Incheon LNG Terminal
    • Korea
    • Korea Gas Corporation (KOGAS)
    • Detail design and turnkey delivery of two recondensers for the extension of the INCHON LNG terminal
    • 1997-1998

North America

  1. Cameron LNG Export Terminal Project
    • USA
    • GDF Suez
    • Owner Engineering in the review of FEED LNG liquefaction/process package
    • 2012

South and Central America

  1. Acajutla LNG Terminal
    • Salvador
    • Quantum
    • Feasibility study for a small scale terminal to be associated to small power generation and to be integrated in existing harbour infrastructure
    • 2012


Other

140 Xiji Liquefaction China BGG/BUGET Review of ITB, FEED and EPC documents for a small scale liquefaction plant 2012 to be installed on Beijing city gate in Xiji

139 Malta Malta Enemalta Comparison of scenario for gas supply to Malta, among pipeline, CNG and 2012 2013 LNG. The comparison includes the site selection, layout, project description and cost estimation

138 Confidential Confidential RUBIS Preparation of typical small scale LNG terminal sizing description and layout 2012





133 Aliaga LNG Terminal Turkey Enerjisa Site validation and project definition 2012

132 North Sumatra Charlie LNG Indonesia PGas Conceptual studies of jetty topside facilities for FSRU 2012 terminal 131 Small liquefaction plant in Beijing China BGG Studies review and follow-up + assistance during construction and 2012 city gates commissioning


  1. **Asphalt plant**
* Belgium
* Van Wellen
* Conversion to fueal gas of a asphalt plant.
* 2012

2012 126 URUPABOL Bolivia/Paraguay/U CAF Feasibility study for the development of a virtual LNG grid to bring LNG to 2012 2012 ruguay Paraguay and Uruguay through the river. The study includes the site selection in the various countries and cover the liquefaction plant, the shipping and the vaporisation units.

  1. **[[[Jorf Lasfar LNG Import Terminal]]]**
* Morocco
* AKWA/SNI
* New LNG Port study and assistance for application to Authorities
* 2012

123 LNG import terminal Guatemala CITEC Feasibility assessment and cost estimation for a small scale LNG terminal in 2012 2012 Guatemala.

  1. **[[[Aqaba Jordan LNG Terminal]]]**
* Jordan
* MEMR
* Site selection and feasability study for a FSRU to be installed in the Aqaba industrial area
* 2012


120 Truck fueling station Netherland EBL/COFELY Generic layout and specification for truck LNG fueling station 2012 2012

  1. **[[[Mejillones LNG Import Terminal]]]**
* Chile
* GNLM
* Consequences analysis after pump accident
* 2011	2012
  1. Priolo Gargallo LNG project
* Italy	Erg	New jetty and CAPEX updating	2011	2012
  1. **[[[Porto Empedocle LNG Terminal]]]**
* Italy
* ENEL
* CAPEX updating
* 2011-2012

116 Desterro confidential Mitsui/GDF SUEZ Site selection and feasibility study for the development of a new LNG import 2011 2012 terminal

115 Son My LNG regas terminal Vietnam PVGas On the basis of the site selection study perfomed by Tractebel Engineering 2011 2012 in association with Royal Haskoning, the site of Son My has been chosen by PV Gas and the Government of Vietnam. Tractebel Engineering and Royal Haskoning have been chosen to develop the feasibility study of this LNG import terminal of an initial capacity of 3 MMTPA with possibilities to increase up to 10 MMTPA.

  1. **[[[Hazira LNG Terminal]]]**
* India
* Hazira LNG - HAZIRA LNG Private Limited (HLPL) is a joint venture between Shell Gas B.V. and Total Gaz Electricite Holdings, France
* Hazira LNG Terminal extension: 
* The Company operates an LNG receiving terminal located along the coastline at Hazira, approx. 35 km from Surat city in the state of Gujarat. 
* Hazira LNG terminal is in commercial operation for approximately 5 years. During this period, HLPL have carried out debottlenecking and plant upgrade modifications, increasing throughput from 2.5 MTPA to 3.64 MTPA. 
* Tractebel Engineering has been awarded a contract for executing FEED, EPC ITB & selection of EPC Contractor and Owner's Engineering services during project imlplementation 
* HLPL now intends to undertake further debottlenecking and expansion works in order to increase Terminal capacity from the present 3.64 MTPA up to 5 MTPA.
* 2011-2013


113 Bejing area LNG importation China Beijing Gas Group (BGG) Beijing Gas Group (BGG) wants to look at alternative sources of gas for the 2011 2012 Beijing area where consumption is about to double from now till 2015. A possibility would be to use LNG imports. Tractebel Engineering - with BUGET (China) - has been entrusted to perform a gas market analysis and perform a site selection study for LNG small terminals

112 Confidential Europe ELENGY Pre-feasibility for best option selection among on- and off-shore solutions 2011 2011 and cost estimation

111 Confidential India confidential DFR for LNG terminal to be integrated in large Port under development 2011 2011

110 Indian East Coast India Reliance-Power Site selection of LNG terminals along East coast (Visag, Kakinada, ...) 2011 2011

109 DIgHi LNG terminal India H-Energy Conceptual study and Owner's Engineer during FEED 2011 2011

108 San Felipe LNG terminal Dominican Generadora San Felipe Feasibility assessment for tank and jetty 2011 2011 Republic 107 Kenya LNG terminal Kenya Enncom Due diligence for cost estimation of new LNG import terminal 2011 2011

106 Kakinada India Kakinada LNG Private Pre-feasibility of a new import LNG terminal 2011 2011 Limited (KLPL) 105 Simar India Hindustan Petroleum Pre-feasibility of a new import LNG terminal 2011 2011 Corporation Ltd. (HPCL)

104 Vietnam LNG Vietnam PetroVietnam Gas (PVGas) Site selection of a new LNG import terminal in Vietnam (in partnership with 2011 2011 Royal Haskoning)

103 LNG bunkering at the port of Netherlands Cofely NL Feasibility study of LNG bunkering in the port of Harlingen (NL) for Doeksen 2010 2011 Harlingen shipping company (pilot case)

102 Para LNG Brazil Termogas Terminal development and feasibility study 2010 2011

  1. **[[[Fos Tonkin LNG Terminal]]]**
* France
* Elengy
* Specific studies for revamping
* 2010-2011			
  1. **[[[Jorf Lasfar LNG Import Terminal]]]**
* Morocco
* AKWA/SNI
* Updating of the 2006 feasibility study for Jorf Lasfar site; cost estimation for Nador site as a comparison
* 2010							
  1. **[[[Chennai LNG Terminal]]]**
* India
* Indian Oil Corporation
* DFR cost updating
* 2010	
  1. **[[[Brindisi LNG Terminal]]]**
* Italy
* BG-Group
* Consultancy for "in-pit" tank design
* 2010
  1. **[[[Fos Tonkin LNG Terminal]]]**
* France
* Elengy
* Basic Engineering for terminal expansion
* 2010

96 Confidential Papua - New Confidential Assistance to Client for a due diligence for a LNG liquefaction plant. 2010 2011 Guinea

  1. **[[[Bonaparte LNG Terminal]]]**
* Australia
* GDF SUEZ - B3G
* Among various configurations contemplated, the infrastructure shall consist in subsea and/or well head platforms, floating LNG production (FLNG). The facilities shall produce LNG, condensates and export will be achieved by offloading from the FLNG onto ship carriers.
* Tractebel Engineering delivered services for Owner's Engineer - Concept selection for offshore facilities (upstream & midstream), site selection, Assistance to Owner for Pre-FEED studies supervision for FLNG, specification for metocean survey campaign for FEED.	
* 2009-2011			
  1. **[[[Mossel Bay LNG Terminal]]]**
* South Africa
* PetroSA
* Owner's Engineering for Deepwater Port and subsea pipeline
* 2009-2010

93 confidential Europe off-taker of the terminal Review project progress and identify potential issues. Due diligence if and 2009 2011 when required by the events.

92 Confidential Russia - Siberia Confidential Assistance to Client for a due diligence for a LNG liquefaction plant in 2009 2011 siberian weather conditions.

  1. **[[[Fluxys Zeebrugge LNG Terminal]]]**
* Belgium
* Distrigaz	
* Feasibility for installation of a 5th tank at the LNG import terminal
* 2009-2010
  1. **[[[Cameroon LNG Terminal]]]**
* Cameroon - Kribi
* GDF SUEZ - B3G
* The facilities consist in onshore gas treatment and liquefaction plant, including marine infrastructures, and an offshore feed gas pipeline network gathering feed gas from several gas fields along the Cameroon coast. The plant shall produce LNG, LPG and condensates and will export products by sea via a loading jetty.
* Tractebel Engineering delivered services for Owner's Engineer - Concept selection (offshore / onshore plant), site selection, Pre-FEED supervision of the plant, survey campaigns for FEED
* 2008-2011
  1. **[[[Mundra LNG Terminal]]]**
* India
* GSPC
* FEED Study for new LNG terminal
* 2009-2010				
  1. **[[[Fluxys Zeebrugge Lng Terminal]]]**
* Belgium
* Fluxys LNG	
* Feasibility Study and conceptual study for 2nd Jetty and interconnection with Grid
* 2009-2010					
  1. **[[[Fluxys Zeebrugge Lng Terminal]]]**
* Belgium
* Fluxys LNG
* EPCM services for Open Rack Vaporizer project
* 2009-2010
  1. Triton LNG
* Italy
* GDF SUEZ - B3G
* Assistance to owner for project management ; Owner's Engineering for supervising FEED contractor during developement of the TRITON offshore LNG terminal
* 2008-2010
  1. **[[[Fos Tonkin LNG Terminal]]]**
* France
* Elengy
* Terminal overall renovation strategic study (Feasibility stage) including feasibility study for new LNG tank.
* 2009-2010
  1. **[[[Atlantic LNG Terminal]]]**
* Trinidad
* Atlantic LNG
* Expertise and Owner's Engineering assignments for LNG tank overhaul	
* 2009-2010					
  1. **[[[Porto Empedocle LNG Terminal]]]**
* Italy
* Nuevo Energy (ENEL)	
* Owner's Engineering for clarification to tenderers and EPC contractor	selection
* 2008	2009
  1. **[[[Rabaska Lng Terminal]]]**
* Canada
* Rabaska LNG
* Contracting Strategy, FEED review and cost optimization.
* 2008-2009
  1. **[[[Singapore Lng Terminal]]]**
* Singapore
* GDF SUEZ
* Review of EXISTING FEED.
* 2008		
  1. **[[[Fos Tonkin LNG Terminal]]]**
* France
* Elengy
* Feasibility study of new tank (4th).
* 2008-2009
  1. **[[[Adria LNG Terminal]]]**
* Croatia (Island of KRK)
* Adria LNG
* Complementary construction environmental study
* 2008						
  1. **[[[Mundra LNG Terminal]]]**
* India
* GSPC
* Site selection and detailed feasibitily study + preFEED studies.
* 2008				
  1. **[[[Fluxys Zeebrugge Lng Terminal]]]**
* Belgium
* Fluxys LNG
* Pre-feasibility of a second extension with new jetty, new tanks and vaporisation
* 2008		.		
  1. **[[[Sines LNG Terminal]]]**
* Portugal
* Transgas Atlantico
* Terminal Extension - FEED and ITB package, Assistance to selection of EPC Contractor and Owner's Engineer assignment during EPC Contract (detailed design and site supervision)
* 2008-2012			
  1. **[[[Fos Tonkin LNG Terminal]]]**
* France
* Elengy
* Consulting activities to prepare renovation and extension of LNG Terminal
* Data collection and analysis of several previous feasibility studies in order to update situation and begin design studies.
* 2008	2008			
  1. **[[[Fluxys Zeebrugge Lng Terminal]]]**
* Belgium
* Fluxys LNG
* Technical feasibility of the installation of the two open rack vaporizers
* 2008


73 FPSO Africa Suez LNG Survey of available liquefaction process for off-shore small or medium scale 2008 2009 installations, and definition of required conditions for project implementation

  1. **[[[Gioia Tauro Medgas LNG Terminal]]]**
* Italy
* MEDGA
* Pre-FEED phase with conceptual design and cost estimate at ± 25 %; (joint venture IRIDE &	 SORGENIA)
* Front End Engineering and Design (FEED) with cost estimate at ± 10 %;	
* Specification of EPC scope and procedures and ITT package.
* The assignment covers the whole terminal except pipe-in-pipe cryogenic lines.	
* 2008
  1. **[[[Gate LNG Terminal]]]**
* Netherlands
* VOPAK
* EPC Contractor
* Design of BOG Recondenser for the EPC contractor
* 2008-2009

70 Feasibility for new LNG terminals Latin America Suez LNG Several studies at feasibility stage in support of development of Suez LNG 2007 2008

69 Snohvit Melkoya Norway Statoil Hydro Feasibility study for loading small LNG Vessels at Melkøya (Snohvit) export 2008 2008 terminal (Vessels ranging 6,000 to 12,000 cbm). The feasibility study covers technical and operational aspects as well as provide input to an update of the third party risk assessment for the operation at Melkøya.

68 Everett LNG Cogeneration Project Boston - USA Distrigas of Massachusetts Feasibility and FEED for cogeneration in Everett LNG Terminal. 2008 2009 LLC Tractebel Engineering scope of work entails the definition phase, intended to define the concept, the capacities and dimensions of the main equipment. This first step mainly consists of process studies (PFD’s, heat and material balances, equipment and line sizing).

67 LIONGAS LNG terminal Netherlands 4Gas O/E Assistance to project developer for a new LNG project in Northern 2008 2009 Europe , primarily to control/supervise the FEED studies to be done by EPC contractor , with option for later supervision of project execution.

  1. **[[[Mejillones LNG Import Terminal]]]**
* Chile
* GNL Mejillones / Tecnicas Reunidas
* BOG Recondenser Design for Norte Mejillones - Design of BOG Recondenser for the EPC contractor
* 2008					

65 Everett LNG Cogeneration Project USA Distrigas of Massachusetts Preliminary consulting service for the definition of a cogeneration unit inside 2008 2008 LLC a LNG plant.

64 Hazira LNG Terminal India Hazira LNG Private Limited Assistance to Owner for terminal expansion studies - Framework agreement 2007 2008 Debottlenecking (HLPL) for Design and Engineering.

63 LNG Terminal in Antifer France, Le Havre Gaz de Normandie (Poweo, Full Owner's Engineer assignment covering : 2007 2009 Eon, Verbund & C.I.M.) - Pre-FEED review and optimisation of regasification system - Assistance to Public Debate - FEED - Assistance to selection of EPC contractor - Owner's Engineer mission with EPC contractor design review and on site supervision of erection.

62 Generic LNG FPSO Generic Confidential Pre-feasibility study - Generic analysis to evaluate the technical feasibility 2007 2008 and economical interest of medium scale LNG liquefaction FPSO concept to monetize stranded gas reserves. Assess current development of technologies and show-stoppers of LNG FPSO concept. Budget estimate of a LNG FPSO . Review of available liquefaction processes.

  1. **[[[Fluxys Zeebrugge LNG Terminal]]]**
* Belgium
* Fluxys LNG
* Feasibility study of increase of send out capacity of the terminal
* 2007			
  1. **[[[Gas Atacama Floating LNG Import Terminal]]]**
* Chile
* GNL Mejillones s.a. 
* Joint FEED study and Owner's Engineering services for a new LNG import venture Suez - Codelco)	terminal in Northern Chile.
* The project consists in the following facilities:
 * a on-shore vaporisation system with a ship used as floating storage (=fast track solution)
 * a classic LNG tank and ancillaries (=long term solution)
* 2006-2010


- -

59 Priolo Gargallo LNG project Sicily - Italy Iono Gas S.r.l. (joint Pre-FEED and FEED for a new receiving LNG terminal in Sicily including: 2006 2007 venture ERG Group and - Conceptual assessment and validation of pre-FEED definition Shell) - Front End Engineering and Design (FEED) - Specification of EPC scope and procedures

58 Cabrillo Port LNG FSRU project Southern California BHP Billiton Technical assistance for the development of a FSRU (Floating Storage and 2006 2006 - USA Regaseification Unit) LNG terminal in Port Cabrillo . Attendance to HAZID meeting.

  1. **[[[Manzanillo LNG Terminal]]]**
* Mexico
* TransCanada Pipelines
* Engineering services for LNG operations and maintenance for the Manzanillo LNG receiving terminal. The scope of services includes: assistance to B.O.T. bid preparation, assistance to EPC contract award, staffing and training of the LNG operation and maintenance team
* 2006-2007
  1. **[[[Fluxys Zeebrugge Lng Terminal]]]**
* Belgium
* Fluxys LNG	
* The extension project consists in the construction of a 4th tank for LNG storage and additional installations to regasify the LNG and to send-out the gas in the transportation network
* Tractebel Engineering has been awarded the mission of Owners Engineer including the contract management and follow-up of all design and construction activities performed by the EPC Contractor
* 2005-2008


55 LNG Terminal Project in Morocco Morocco Afriquia Gaz s.a. Feasibility study and FEED for a new LNG import terminal for 5 billion 2006 2007 Office National de m³/year : l'Electricité (ONE) Scope of services includes : Société Anonyme Marocaine - LNG Terminal Feasibility Study including site selection, shipping study; de l'Industrie du Raffinage - Development of the LNG Terminal FEED (Front End Engineering Design) (SAMIR) Package and EPC Invitation to Bid (ITB) documents; - Development of the New Gas Pipeline FEED Package and EPC ITB documents; - Assistance to the Parties for the selection of the EPC Contractor on a lump sum turnkey price basis.

  1. **[[[Porto Empedocle LNG Terminal]]]**
* Italy
* ENEL
* FEED for a new 8 bcm/y LNG terminal, including shipping study, marine access and operation, optimisation studies and simulation reports, EPC bid packing, EPC cost and schedule estimations, seismic study
* 2006-2007		
  1. **[[[Pyeongtaek LNG Terminal]]]**
* Korea
* Korea Gas Corporation
* Installation of 2 new LNG recondensers - fluid flow per unit : 855000 kg/h.	
* Scope of Services includes:
 * issue of technical specifications
 * material requisition;
 * procurement follow-up;
 * site supervision and commissioning follow-up
* 2006-2007
  1. **[[[Calhoun LNG Terminal]]]**
* Texas - USA
* Calhoun LNG, L.P.
* FEED for a new LNG terminal at Port Lavaca/Port Comfort,Texas designed for receiving, storing, processing and vaporizing LNG
* The Terminal marine facilities have been designed to accomodate LNG carriers in the 75000m³ class up to the 220000m³ class and for a maximum unloading rate of 13000m³/h
* The storage capacity is 2*160 000m³. Vaporization and send-out capacity has been fixed at 1000 MMscfd
* 2005-2006
  1. **[[[Gate LNG Terminal]]]**
* Netherlands
* VOPAK
* Technical assistance for the Development of the Gate LNG terminal in Rotterdam including layout optimisation and finalisation (jetty configuration, building dimensions, LNG pipe routing, ….), storage tank and BOG handling comparison studies, assistance to risk analysis, process optimisation studies, vaporiser selection study, equipment list, noise map, 
* 2005-2006		
  1. **[[[Fluxys Zeebrugge Lng Terminal]]]**
* Belgium
* Fluxys LNG	
* Feasibility of use of open rack vaporizer
* 2005
  1. **LNG Terminal Project in Slovenia**
* Slovenia
* Confidential
* Site selection and feasibility study for the development of a new LNG terminal in Slovenia
* 2005-2006
  1. **[[[Quintero LNG Import Terminal]]]**
* Chile - Quintero Bay - Suez Andino
* ENAP
* Assistance for the elaboration feasibility study and conceptual design of a BOO bid for a new LNG terminal in Chile
* 2005-2006


47 ALTIRO LNG Terminal Quintero Bay - Suez Andino Technical Assistance for the development of a new Floating Storage and 2005 2006 Chile Regasification Unit in Chile

  1. **[[[Reganosa Ferrol LNG Terminal]]]**
* Coruna - Spain
* Mugardos-La	REGANOSA (Regasificadora del Noroeste s.a.)
* Complete EPC turnkey project including Authority Engineering for a 5.2 bcm/y import terminal, with unloading jetty, 2 LNG storage tanks of 150.000 m³, a LNG truck loading station and natural gas distribution system to the local grid at 80 barg
* 2003-2007	

45 Snohvit LNG Project Melkoya Island - STATOIL ASA Complete EPC turnkey project for a 5.8 bcm/y export terminal with loading 2002 2007 Hammerfest - jetty and - 2 LNG storage tanks 125.000 m³ - 1 LPG storage tank 45.000 m³ Norway - 1 condensate storage tank 75.000 m³.

44 Grain LNG Recondenser Project Kent, United Grain LNG Ltd Design and supply of a recondenser and associated equipment/pipework for 2005 2006 Kingdom the recondensation of BOG with subcooled LNG at the flowrate of 56.5 t/h (BOG)

43 Kitimat LNG import Terminal British Columbia, Kitimat LNG Inc. FEED for a new LNG terminal at Kitimat, Canada with unloading facilities 2005 2005 Canada equipped with 4 unloading arms and provision for the installation of a fifth. The jetty has been designed to receive LNG carriers of up to 200 000 m³ capacity. The LNG terminal will have a send-out capacity of 610 MMSCFD of Natural Gas (increasing to 1000 after future expansion). Natural gas will be delivered to a pipeline inlet located downstream of the terminal metering, at a maximum operating pressure of 100 bara. The projects includes : unloading system, LNG recovery and fractionation system, two LNG storage of 160 000m³, gas vaporiser send out facilities, associated facilities and buildings, LPG storage and loading facilities.


40 LNG terminal at Krishnna Pattanam India Indian Oil Corporation Technical feasibility study for the implementation of the LNG terminal at 2003 2004 port Limited (IOCL) Krishnna Pattanam including the identification of the site, study of the port facilities, LNG receiving terminal, overall cost estimation and EIA study. Capacity of the terminal will be 2,5 mm TPA, expandable to 3,75 mm TPA

39 Kerala LNG Terminal India India Oil Corporation Consultancy services for the preparation of a detailed feasibility report for a 2004 2004 Limited (IOCL) new LNG import terminal in Kerala

  1. [[[Gwangyang LNG Terminal]]]
* Korea
* DAELIM Industrial Co. Ltd
* Turnkey contract for one 28 t/h recondensor
* 2003-2004
  1. **[[[Fluxys Zeebrugge Lng Terminal]]]**
* Belgium
* Fluxys LNG	
* FEED for the extension of the Zeebrugge LNG receiving terminal covering a 4th LNG storage tank & the increase of send-out capacity by 50 %
* An important feature of this project was the definition of the tie-ins with existing LNG terminal and the design of the new installations in order to allow erection without impacting the operation of existing facilities
* 2003-2003


36 Urumqi Liquefaction Plant Xinjang Guanghai - Xinjang Guanghai Detailed Engineering / Procurement / Construction Supervision / Test, 2002 2004 P.R. China Enterprises & Investment Commissioning and Start-up for a Natural Gas liquefaction plant for Group 1.500.000 Nm³ natural gas per day incl. gas treatment system and a LNG storage tank with LNG distribution system via trucks and rail cars. The natural gas liquefaction plant is designed using a closed mixed refrigerant cycle. The project includes a LNG storage tank 30.000 m³ capacity.


34 Dudzele Peak - Shaving Plant Dudzele - Belgium Distrigaz Environment Impact Assessment (EIA) / Authority Engineering / Risk 1999 2002 Assessments / Feasibility Study / Detailed Engineering / Material & Equipment Specifications / Construction Supervision for the utilisation of a 19.000 m³ liquid nitrogen storage tank for increasing LNG storage capacity in Belgium 33 Aliaga LNG Terminal Izmir - Turkey BOTAS Site Selection / Environment Impact Assessment (EIA) / Risk Assessments / 1997 1997 Project Management / Shipping Study / Basic Design / EPC Specification for Aliaga (Izmir).

32 Iskenderun LNG Terminal Iskenderun Gulf - BOTAS Site Selection / Environment Impact Assessment (EIA) / Risk Assessments / 1997 1997 Turkey Project Management / Shipping Study / Basic Design / EPC Specification for Iskenderun Gulf LNG Terminal.


30 Kakinada LNG Receiving Terminal Kakinada - India Indian Oil Corporation (IOC) Feasibility Study / Cost Estimates / Conceptual Design Review for a new 2000 2000 import LNG Terminal in Kakinada. The Detailed Project Report (DPR) includes : site data review and selection, preliminary shipping study, jetty/offshore requirement, tank selection, process design, utilities and offsite requirement, terminal layout, CAPEX, OPEX and project schedule.

  1. **[[[Marmara LNG Terminal]]]**
* Turkey
* BOTAS
* Conceptual Design / Detailed Engineering / Material & Equipment Specifications / Construction Specifications / Construction Supervision / Test, Commissioning and Start-up for the increase of the nominal capacity from 4 bcm/y up to 6 bcm/y by addition of a 3d vaporiser and associated pumps and basins.
* 1998-2000


28 Le Verdon France ELF feasibility study for the installation of a LNG terminal in Le Verdon. 1999 1999

27 Confidential China Confidential Technico-economical feasibility study of a LNG receiving terminal of 2.5 1999 1999 mtpa send out capacity, extendable to 5 mtpa.

  1. **[[[Fluxys Zeebrugge Lng Terminal]]]**
* Belgium
* Distrigaz	
* Feasibility Study for the extension of the Zeebrugge LNG receiving terminal covering:
 * - a 4th LNG storage tank, which capacity will be the largest possible one considering the existing facilities and the specific conditions which are specified in the construction permit (royal Decree);
 * the increase of the send-out capacity by approximately 50 % on top of the current peak performances of the plant
* 1998


25 Gadisa LNG Terminal Galicia - Spain Gadisa Review of the Client plot plan to be integrated in an existing industrial plant. 1998 1998

24 Energy Analysis of Base Load LNG United Kingdom Britrish gas PLC The aim of the project was to carry out simulation of 2 base load LNG Plants processes and compare performance and thermodynamic losses. 1997 1998


  1. **[[[Incheon LNG Terminal]]]**
* Korea
* Korea Gas Corporation (KOGAS)
* Detail design and turnkey delivery of two recondensers for the extension of the INCHON LNG terminal
* 1997-1998		
  1. **LNG terminal in Izmir Area**
* Turkey
* Izmir / Aliaga Area
* TOTAL
* Feasibility Study for a new LNG terminal feeding two power plants and a gas grid. The build-up for the total send out was anticipated to be 1.8 - 4.0 - 8.0 billion Ncbm/year.
* Storage capacity was estimated at 180.000 cbm during the first phase, and 270.000 cbm later. The feasibility study included the choice of the technical options and the comparison of the two,  accounting previously selected sites, for their specific requirements.
* 1996	 				
  1. **[[[Pyeongtaek LNG Terminal]]]**
* Korea
* Korea Gas Corporation
* Turnkey Contracting for 1x60 tph boil-off recovery unit in LNG receiving Gas Recondensing System 
* The system includes a recondensing unit, three boosting cryogenic pumps,	the related interconnection piping and the centralised control system	
* 1996-1997
  1. **[[[Marmara LNG Terminal]]]**
* Turkey
* BOTAS
* Assistance to BOTAS in the Plant - Assistance to Operations including training, audits and improvements
* 1994-1997
  1. **[[[Fluxys Zeebrugge Lng Terminal]]]**
* Belgium
* Distrigaz	
* LNG Vaporisation - Cogeneration
* Feasibility Study / Front End - Basic Design / Detailed Engineering / Construction Management and Supervision / Test, Commissioning and Start-up for a cogeneration project within the LNG terminal of Zeebrugge.
* Residual heat of a 40 MW turbine exhaust was recovered in order to be used to heat the waterbath of existing, submerged, combustion vaporisers (send out capacity : 900.000 Ncbm/h).
* 1993-1995


18 LNG Receiving Terminal in China - China Confidential Feasibility Study : 1996 1996 Cost Saving Study Analysis of all possibilities to reduce the operating costs (OPEX) of a 1 million tpa and a 4 million tpa LNG receiving terminal.

17 Iran Gas Europe Thrace (Greece), IRAN GAS EUROPE (EIG) Feasibility Study / Shipping Study for the maritime transportation of LNG 1995 1996 Fos-sur-Mer from Iran to Europe, and of the vaporisation in three receiving terminals - to (France), KRK be installed along the North coast of the Mediterranean. Island (Croatia) - Croatia : 3 x 125.000 cbm storage tanks with 10 bcm send-out capacity; - France : 2 x 125.000 cbm storage tanks with 6 bcm send-out capacity ; - Greece : 3 x 105.000 cbm storage tankds with 6 bcm send-out capacity. In addition, the ship fleet was optimised and the carriers technologies were compared. The investment and operating costs were determined.

  1. **[[[Incheon LNG Terminal]]]**
* Korea
* Korea Gas Corporation (KOGAS)
* Turnkey Contracting for 2x30 tph of boil-off recovery unit in LNG receiving Recondenser Units
* 1995-1996	
  1. **[[[Marmara LNG Terminal]]]**
* Turkey
* BOTAS
* Project Management / Engineering Supervision / Construction Management and Supervision / Test, Commissioning and Start-up / Assistance to Operation
* The project involved the construction of a LNG terminal of 4 billion Ncbm/year capacity (peaking at 6 billion Ncbm/year). Furthermore, it included 3 storage tanks of 85.000 cbm each, unlading facilities for vessels of 40.000 Ncbm to 130.000 cbm, a boil-off handling and displacing system and a LNG send out system including both types of vaporiser (submerged construction an seawater types). The max. send out capacity is 685.000 Ncbm/h. A 22 km long pipeline connects the terminal with the main Soviet gas import pipeline.
* 1989-1996


14 Tatan LNG Receiving Terminal Tatan Area - Suez Energy International / Review of the feasibility study performed for TPC (Taiwan Power 1995 1995 Taiwan TUNTEX Company)/CPC (Chinese Petroleum Company) to reduce the overall schedule and the investment cost of an imported LNG terminal in the North part of the Island. The project included LNG unloading facilities, LNG storage tanks, a vaporisation supply system and a natural gas fired power plant, etc.

  1. **[[[Adria LNG Terminal]]]**
* Croatia (Island of KRK)
* ADRIA Consortium (OMV, TOTAL, …)
* Site selection / Risk Assessments / Shipping Study / Front-End - Basic Design / EPC Specifications for the ADRIA LNG receiving terminal
* Final capacity of the terminal corresponds to 10 billion Ncbm/year. The terminal facility comprises : a LNG carrier berthing, unloading facilities, full	containment storage tanks (3 x 120.000 cbm), vaporisation and transportation facilities.	
* 1993-1995			

12 LNG Receiving Terminal in Thailand Khao Bo Yai - Petroleum Authority of Site Selection / Environment Impact Assessment (EIA) / Risk assessments / 1993 1995 Thailand Thailand (PTT) Conceptual Design for the construction of a LNG terminal with an annual capacity in phase 1 & 2 respectively : 5 million tpy, 10 million tpy, plus an associate send-out rate of 600 tph and 1.200 tph. On the recommended site of Khao Bo Yai, the EIA study and associated risk analysis were performed. Two EIA reports were prepared, one for the site (dykes and back filling), and one for the terminal.


  1. **[[[Sonatrach Skikda Lng Terminal]]]**
* Algeria
* Sonatrach
* Renovation and revamping of gas liquefaction plants in Skikda (GL1K)
* 1997
  1. **[[[Bethioua LNG Export Terminal]]]**
* Algeria
* Sonatrach
* Renovation and revamping of gas liquefaction plants in Bethioua (GL1Z and GL2Z)
* 1994
  1. **[[[Sines LNG Terminal]]]**
* Portugal
* Preliminary engineering studies to submit a turnkey proposal for the terminal, with the exception of the construction of the storage tanks (2 x 75.000 cbm each)
* 1993		

.

7 Montalto Di Castro LNG Receiving Montalto Di Castro ENEL Risk Assessments / Conceptual Design / Basic Design for a new LNG reciving 1991 1992 Terminal - Italy terminal in Montalto di Castro. Assistance in defining the project's basis data and the preliminary studies basic design of the storage tanks (4 x 75.000 cbm) and offshore piping works.

6 LNG Receiving Terminal in North Taipei - Taiwan Chinese Petroleum Risk assessments / Feasibility study / Shipping study for an import LNG 1991 1992 Taiwan Company COMPANY (CPC) - terminal located in the Northern part of the island. The project included the Taiwan Power Company unloading facilities, LNG storage tanks, vaporisation to supply a 4000 MW (TPC) natural gas fired power plant, etc. The LNG plant had to be built on a reclaimed area, protected by breakwaters.

5 Huelva and Cartagena LNG Storage Huelva and ENAGAS Technical assistance to integrate the most recent technology in both sites' 1985 1986 Tanks Cartagena LNG storage tanks. (60.000 cbm & 55.000 cbm) including tank specifications, design review, construction, supervision, routine activities, such as definition of the load cases, metallurgical specification, accidental conditions, thermal analysis, seismic and impact design, instrumentation details and fire protection.

+++ Links