Touat Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Sonatrach
- Country: Algeria
- Location: 1500km South West of Algiers
- Production start: Expected 2016
- Partners: Neptune
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume: Design Capacity - 12,500 barrels per day
Description
- The development includes
- a network of 30 production gathering flow-lines,
- two field production facilities at Hassi Illatou and Oued Tourhar,
- two oil and gas trunklines from the FPF’s to the central production facility
- a 81km crude oil export pipeline to transport the stabilised crude oil to the [[[Soralchin Refinery]]], near Adra
Contractors
- **Tеcnicas Reunidas:** Gas production and processing facilities
History
- 2002 - GDF SUEZ signed a production sharing contract with Sonatrach for the Touat region
- 2013 - Tеcnicas Reunidas awarded EPC contract
- 2018 - Neptune acquired Engie's stake
- 2023 - ENI agrees to acquire Neptune
Geology
Links
- Mott MacDonald, TOUAT Oilfield
- Tеcnicas Reunidas gets a one thousand million dollars contract in Algeria
- Neptune Energy completes the acquisition of ENGIE E&P International SA
- Eni and Vår Energi to acquire Neptune, a leading independent exploration and production company with low emission, gas-oriented operations in Western Europe, North Africa, Indonesia and Australia