Difference between revisions of "Tortue Ahmeyim Oil and Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 15: | Line 15: | ||
=== Contractors === | === Contractors === | ||
− | * | + | * '''TechnipFMC:''' FEED for the FPSO |
− | * * | + | * '''CIMC Raffles:''' Accommodation platform |
− | * | + | * '''KBR'''Front End Engineering Design (FEED) contract for Phase 1 |
− | * | + | * '''McDermott:''' FEED for the subsea umbilicals, risers and flowlines (SURF) scope for the project |
+ | * '''BHGE:''' FEED for the subsea production system (SPS) scope | ||
=== History === | === History === | ||
Line 28: | Line 29: | ||
* 2018 - KBR awarded FEED | * 2018 - KBR awarded FEED | ||
* 2018 - Final investment decision reached | * 2018 - Final investment decision reached | ||
+ | * 2022 - Accommodation platform delivered | ||
=== Geology === | === Geology === | ||
Line 40: | Line 42: | ||
# [http://killajoules.wikidot.com/archive:kbr-awarded-feed-contract-for-bps-tortue-project KBR Awarded FEED Contract for BP’s Tortue Project] | # [http://killajoules.wikidot.com/archive:kbr-awarded-feed-contract-for-bps-tortue-project KBR Awarded FEED Contract for BP’s Tortue Project] | ||
# [http://killajoules.wikidot.com/archive:bp-announces-final-investment-decision-for-phase-1-o/ BP announces Final Investment Decision for Phase 1 of the Greater Tortue Ahmeyim LNG Development] | # [http://killajoules.wikidot.com/archive:bp-announces-final-investment-decision-for-phase-1-o/ BP announces Final Investment Decision for Phase 1 of the Greater Tortue Ahmeyim LNG Development] | ||
+ | # [https://abarrelfull.blogspot.com/2024/01/cimc-raffles-delivered-first-feedepc.html CIMC Raffles Delivered the First FEED+EPC Project to BP] | ||
# [https://a-barrel-full.blogspot.com/2020/08/technipfmc-awarded-large-epcic-contract.html TechnipFMC Awarded a Large EPCIC Contract for BP Greater Tortue Ahmeyim Development FPSO] | # [https://a-barrel-full.blogspot.com/2020/08/technipfmc-awarded-large-epcic-contract.html TechnipFMC Awarded a Large EPCIC Contract for BP Greater Tortue Ahmeyim Development FPSO] | ||
+ | |||
+ | [[Category:Field]] | ||
+ | [[Category:Mauritania]] | ||
+ | [[Category:Senegal]] | ||
+ | [[Category:BP]] |
Latest revision as of 16:16, 4 January 2024
Summary Information
- Operator: BP
- Country: Mauritania / Senegal
- Location:
- Production start:
- Partners: BP, Kosmos
- Type: Oil & Gas
- Estimated Reserves: 20 TCF of gas
- Production Volume:
Description
- The initial phase of the Greater Tortue Ahmeyim project will produce gas from an ultra-deepwater subsea system comprising of four wells, and a mid-water floating production, storage and offloading (FPSO) vessel, which will process the gas, removing heavier hydrocarbon components. The gas will then be transferred to a floating liquefied natural gas (FLNG) facility, Greater Tortue FLNG Project at a nearshore hub located on the Mauritania and Senegal maritime border.
- The project involves a sharing of resources between Senegal and Mauritania
- The Tortue, Ahmeyim and Guembeul gas fields make up the development
Contractors
- TechnipFMC: FEED for the FPSO
- CIMC Raffles: Accommodation platform
- KBRFront End Engineering Design (FEED) contract for Phase 1
- McDermott: FEED for the subsea umbilicals, risers and flowlines (SURF) scope for the project
- BHGE: FEED for the subsea production system (SPS) scope
History
- 2015 - Tortue field discovered
- 2016 - Ahmeyim and Guembeul gas discoveries made
- 2016 - BP aquires a majority stake from Kosmos
- 2018 - TechnipFMC awarded FPSO project
- 2018 - KBR awarded FEED
- 2018 - Final investment decision reached
- 2022 - Accommodation platform delivered
Geology
Links
- Kosmos Energy Makes Significant Gas Discovery Offshore Mauritania
- Kosmos Energy Announces Successful Appraisal of Gas Discovery Offshore Mauritania and Senegal
- Kosmos Energy and BP Announce Partnership in Mauritania and Senegal
- BP selects McDermott and BHGE for subsea contracts for West African Tortue/Ahmeyim Development
- TechnipFMC awarded contract for Tortue/Ahmeyim Development FPSO
- KBR Awarded FEED Contract for BP’s Tortue Project
- BP announces Final Investment Decision for Phase 1 of the Greater Tortue Ahmeyim LNG Development
- CIMC Raffles Delivered the First FEED+EPC Project to BP
- TechnipFMC Awarded a Large EPCIC Contract for BP Greater Tortue Ahmeyim Development FPSO