Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: RWE Dea * Country: UK * Location: Blocks 49/1a and 49/2a Southern North Sea * Production start: 2009 * Partners: Ithaca * Type: Gas * Estimate...") |
Abarrelfull (talk | contribs) |
||
Line 16: | Line 16: | ||
* **Technip:** Pipelay, tie-in activities and umbilical supply | * **Technip:** Pipelay, tie-in activities and umbilical supply | ||
* **KWSubsea:** | * **KWSubsea:** | ||
− | + | ** FEED of subsea tie-back | |
− | + | ** Detailed design of subsea pipeline tie-back | |
+++ History | +++ History |
Latest revision as of 16:24, 3 September 2023
Summary Information
- Operator: RWE Dea
- Country: UK
- Location: Blocks 49/1a and 49/2a Southern North Sea
- Production start: 2009
- Partners: Ithaca
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Topaz subsea well head and protective structure, is a gas producing seabed installation tied back to the Schooner Gas Field (Tullow) via 15 kms of 6-inch diameter pipeline.
- Gas is then transported onward to the Caister Murdoch System (ConocoPhillips) and Theddlethorpe Gas Processing Plant
+++ Contractors
- **Technip:** Pipelay, tie-in activities and umbilical supply
- **KWSubsea:**
- FEED of subsea tie-back
- Detailed design of subsea pipeline tie-back
+++ History
- 1987 - Topaz Gas Field discovered
- 2006 - RWE Dea increased its stake in the Topaz field
- 2008 - Final investment decision made
- 2009 - Project development approved by UK Goverment
- 2009 - First gas produced
- 2010 - Ithaca acquired a 35% stake from GDF Suez
+++ Geology
+++ Links