Difference between revisions of "Tolmount Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
(14 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Habour Energy |
− | * Country: | + | * Country: UK |
− | * Location: | + | * Location: Southern North Sea |
− | * Production start: | + | * Production start: 2021 |
− | * Partners: | + | * Partners: Habour Energy 50%, Dana Petroleum 50% |
− | * Type: | + | * Type: Gas |
− | * Estimated Reserves: | + | * Estimated Reserves: The field is expected to produce around 90 million boe gross over its lifetime |
− | * Production Volume: | + | * Production Volume: 56,000 boe a day at peak production |
=== Description === | === Description === | ||
* The Tolmount gas field is situated in Block 42/28d, in the UK southern North Sea. | * The Tolmount gas field is situated in Block 42/28d, in the UK southern North Sea. | ||
+ | * It is connected to an onshore gas plant at Dimlington, by a dedicated pipeline, known as the Humber Gathering System | ||
* Tolmount East is located in Block 42/28d of the southern North Sea. The project comprises a single well development, installation of subsea infrastructure, and a 4-kilometre, 12-inch pipeline tied back to the HGS Tolmount minimum facilities platform. | * Tolmount East is located in Block 42/28d of the southern North Sea. The project comprises a single well development, installation of subsea infrastructure, and a 4-kilometre, 12-inch pipeline tied back to the HGS Tolmount minimum facilities platform. | ||
=== Contractors === | === Contractors === | ||
− | * | + | * Rosetti Marino: EPCIC contract for the platform |
+ | * Costain: FEED study for Tolmount gas onshore plant | ||
=== History === | === History === | ||
Line 20: | Line 22: | ||
* 2013 - Appraisal drilling carried out | * 2013 - Appraisal drilling carried out | ||
* 2016 - Premier oil acquired a 50% stake | * 2016 - Premier oil acquired a 50% stake | ||
+ | * 2018 - Approval granted for Tolmount | ||
+ | * 2018 - Rosetti Marino awarded the EPCIC contract for the platform | ||
+ | * 2019 - Gas discovered in Tolmont East | ||
* 2020 - The HGS Tolmount platform was successfully installed | * 2020 - The HGS Tolmount platform was successfully installed | ||
* 2021 - Tolmont east was sanctioned | * 2021 - Tolmont east was sanctioned | ||
+ | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy | ||
=== Geology === | === Geology === | ||
Line 27: | Line 33: | ||
=== Links === | === Links === | ||
+ | # [[UK Oil and Gas Fields by Approval Date]] | ||
# [https://abarrelfull.blogspot.com/2021/12/completion-of-strategic-review-of-north.html Completion of Strategic Review of North Sea E&P Business – divestiture of UK Exploration & Production Business to Premier Oil] | # [https://abarrelfull.blogspot.com/2021/12/completion-of-strategic-review-of-north.html Completion of Strategic Review of North Sea E&P Business – divestiture of UK Exploration & Production Business to Premier Oil] | ||
+ | # [https://abarrelfull.blogspot.com/2021/12/costain-awarded-feed-study-contract-for.html Costain awarded FEED study contract for Tolmount gas onshore plant at Dimlington] | ||
# [https://abarrelfull.blogspot.com/2021/12/rosetti-marino-is-pleased-to-announce.html Rosetti Marino is pleased to announce the award of the EPCIC contract for Tolmount Field Development Project] | # [https://abarrelfull.blogspot.com/2021/12/rosetti-marino-is-pleased-to-announce.html Rosetti Marino is pleased to announce the award of the EPCIC contract for Tolmount Field Development Project] | ||
+ | # [https://abarrelfull.blogspot.com/2021/12/tolmount-east-success.html Tolmount East success] | ||
+ | # [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading] | ||
[[category:Field]] | [[category:Field]] | ||
− | [[category: | + | [[category:UK]] |
− | [[category: | + | [[category:Harbour Energy]] |
Latest revision as of 15:56, 30 October 2023
Summary Information
- Operator: Habour Energy
- Country: UK
- Location: Southern North Sea
- Production start: 2021
- Partners: Habour Energy 50%, Dana Petroleum 50%
- Type: Gas
- Estimated Reserves: The field is expected to produce around 90 million boe gross over its lifetime
- Production Volume: 56,000 boe a day at peak production
Description
- The Tolmount gas field is situated in Block 42/28d, in the UK southern North Sea.
- It is connected to an onshore gas plant at Dimlington, by a dedicated pipeline, known as the Humber Gathering System
- Tolmount East is located in Block 42/28d of the southern North Sea. The project comprises a single well development, installation of subsea infrastructure, and a 4-kilometre, 12-inch pipeline tied back to the HGS Tolmount minimum facilities platform.
Contractors
- Rosetti Marino: EPCIC contract for the platform
- Costain: FEED study for Tolmount gas onshore plant
History
- 2011 - Tolmont field discovered
- 2013 - Appraisal drilling carried out
- 2016 - Premier oil acquired a 50% stake
- 2018 - Approval granted for Tolmount
- 2018 - Rosetti Marino awarded the EPCIC contract for the platform
- 2019 - Gas discovered in Tolmont East
- 2020 - The HGS Tolmount platform was successfully installed
- 2021 - Tolmont east was sanctioned
- 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
Geology
Links
- UK Oil and Gas Fields by Approval Date
- Completion of Strategic Review of North Sea E&P Business – divestiture of UK Exploration & Production Business to Premier Oil
- Costain awarded FEED study contract for Tolmount gas onshore plant at Dimlington
- Rosetti Marino is pleased to announce the award of the EPCIC contract for Tolmount Field Development Project
- Tolmount East success
- Harbour Energy to be admitted to trading