Difference between revisions of "Tolmount Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 14: | Line 14: | ||
=== Contractors === | === Contractors === | ||
− | * | + | * Rosetti Marino: EPCIC contract for the platform |
=== History === | === History === |
Revision as of 11:25, 2 December 2021
Summary Information
- Operator:
- Country:
- Location:
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Tolmount gas field is situated in Block 42/28d, in the UK southern North Sea.
- Tolmount East is located in Block 42/28d of the southern North Sea. The project comprises a single well development, installation of subsea infrastructure, and a 4-kilometre, 12-inch pipeline tied back to the HGS Tolmount minimum facilities platform.
Contractors
- Rosetti Marino: EPCIC contract for the platform
History
- 2011 - Tolmont field discovered
- 2013 - Appraisal drilling carried out
- 2016 - Premier oil acquired a 50% stake
- 2018 - Rosetti Marino awarded the EPCIC contract for the platform
- 2020 - The HGS Tolmount platform was successfully installed
- 2021 - Tolmont east was sanctioned