Difference between revisions of "Tiffany Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* Often referred to as the “T-Block,” the Tiffany, Toni and Thelma fields are located in the Central North Sea, around 155 miles north east of Aberdeen. | * Often referred to as the “T-Block,” the Tiffany, Toni and Thelma fields are located in the Central North Sea, around 155 miles north east of Aberdeen. | ||
* The **Toni** and **Thelma** fields are subsea tie-backs, with production via subsea manifolds to the Tiffany platform. | * The **Toni** and **Thelma** fields are subsea tie-backs, with production via subsea manifolds to the Tiffany platform. | ||
Line 15: | Line 15: | ||
* Gas volumes are transported northwards via pipeline to the Brae field and is then transported via the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] to the [[[Sage St Fergus Gas Processing Terminal]]] | * Gas volumes are transported northwards via pipeline to the Brae field and is then transported via the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] to the [[[Sage St Fergus Gas Processing Terminal]]] | ||
− | + | === Contractors === | |
* **Consorzio Ital Offshore:** Platform construction | * **Consorzio Ital Offshore:** Platform construction | ||
* **Saipem:** Tiffany Platform T&I | * **Saipem:** Tiffany Platform T&I | ||
Line 24: | Line 24: | ||
* **Bibby Offshore:** Toni well conversation to gas lift | * **Bibby Offshore:** Toni well conversation to gas lift | ||
− | + | === History === | |
* 1990 - Government approval granted for Tiffany & Toni | * 1990 - Government approval granted for Tiffany & Toni | ||
* 1993 - First oil from Tiffany | * 1993 - First oil from Tiffany | ||
Line 31: | Line 31: | ||
* 2005 - Toni field converted to gas life | * 2005 - Toni field converted to gas life | ||
− | + | === Geology === | |
− | * | + | * |
=== Links === | === Links === |
Revision as of 12:14, 22 September 2022
Summary Information
- Operator: CNR International
- Country: UK
- Location: Central North Sea
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- Often referred to as the “T-Block,” the Tiffany, Toni and Thelma fields are located in the Central North Sea, around 155 miles north east of Aberdeen.
- The **Toni** and **Thelma** fields are subsea tie-backs, with production via subsea manifolds to the Tiffany platform.
- Oil from the fields is exported from the Tiffany platform via a short link to the Brae – Forties oil pipelines and onward to shore at Cruden Bay in North East Scotland.
- Gas volumes are transported northwards via pipeline to the Brae field and is then transported via the [[[Scottish Area Gas Evacuation (SAGE) Pipeline]]] to the [[[Sage St Fergus Gas Processing Terminal]]]
Contractors
- **Consorzio Ital Offshore:** Platform construction
- **Saipem:** Tiffany Platform T&I
- **SLP Engineering:** Thelma Manifold Structure
- **Seaway Heavy Lifting:** T & I for the Thelma Manifold Structure
- **VWS Westgarth:** Water Treatment
- **Subsea 7:** Replacement subsea control modules (SCMs) and flexibles jumpers
- **Bibby Offshore:** Toni well conversation to gas lift
History
- 1990 - Government approval granted for Tiffany & Toni
- 1993 - First oil from Tiffany
- 1995 - Approval for Thelma
- 2004 - CNR acquired a major stake from ENI
- 2005 - Toni field converted to gas life
Geology
Links
- List Of Oil Production Platforms In The UK
- VWS Westgarth FPSO References
- Seaway Heavy Lifting Oil And Gas References
- FoundOcean Europe Subsea References
- Saipem Europe Fixed Offshore Production Facilities Project R
- Bibby Offshore Subsea References
- Canadian Natural Resources Limited Announces The Acquisition Of UK North Sea Core Properties
- Subsea 7 Announces North Sea Contract for CNR