Difference between revisions of "Thunder Hawk Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Murphy Oil * Country: USA * Location: Mississippi Canyon Block 734 in the Gulf of Mexico * Production start: 2009 * Partners: Murphy Oil - 37.5...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Murphy Oil | * Operator: Murphy Oil | ||
* Country: USA | * Country: USA | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* A semi-submersible floating production unit with production capacity of 45,000 barrels of oil per day and 70 million cubic feet per day of natural gas is being utilized. | * A semi-submersible floating production unit with production capacity of 45,000 barrels of oil per day and 70 million cubic feet per day of natural gas is being utilized. | ||
* The field will initially produce from three subsea wells connected via flow lines to the facility, which is installed in 6,050 feet of water | * The field will initially produce from three subsea wells connected via flow lines to the facility, which is installed in 6,050 feet of water | ||
− | * The Big Bend | + | * The [[Big Bend and Dantzler Oil and Gas Field]] are tiedback to Thunder Hawk platform |
* The Big Bend field is 18 miles from the Thunder Hawk platform in 7,200 feet of water in Mississippi Canyon Block 698 | * The Big Bend field is 18 miles from the Thunder Hawk platform in 7,200 feet of water in Mississippi Canyon Block 698 | ||
* The Dantzler field is 7 miles from the Thunder Hawk platform in 6,580 feet of water in Mississippi Canyon Block 782 | * The Dantzler field is 7 miles from the Thunder Hawk platform in 6,580 feet of water in Mississippi Canyon Block 782 | ||
− | + | === Contractors === | |
* **SBM Offshore:** Supply and operation of Semi-submersible production unit | * **SBM Offshore:** Supply and operation of Semi-submersible production unit | ||
* **Kiewit:** Semi-submersible hull construction | * **Kiewit:** Semi-submersible hull construction | ||
Line 23: | Line 23: | ||
* **First Subsea:** Installation of the twelve mooring connectors | * **First Subsea:** Installation of the twelve mooring connectors | ||
− | + | ==== Big Bend & Dantzler ==== | |
* **EMAS AMC:** Engineering, procurement, construction and installation of subsea tie-backs | * **EMAS AMC:** Engineering, procurement, construction and installation of subsea tie-backs | ||
− | + | === History === | |
* 2004 - Thunder Hawk Oil And Gas Field discovered | * 2004 - Thunder Hawk Oil And Gas Field discovered | ||
* 2005 - Hydro acquires a 25% stake | * 2005 - Hydro acquires a 25% stake | ||
Line 35: | Line 35: | ||
* 2015 - W&T Offshore Announces First Production at Big Bend | * 2015 - W&T Offshore Announces First Production at Big Bend | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Gulf Of Mexico Permanent Deepwater Structures]] | # [[Gulf Of Mexico Permanent Deepwater Structures]] | ||
# [[Gulf Of Mexico Discoveries In Water Depths Greater Than 5000]] | # [[Gulf Of Mexico Discoveries In Water Depths Greater Than 5000]] | ||
Line 53: | Line 53: | ||
# [http://killajoules.wikidot.com/blog:6026 Ezra's Subsea Services Division, EMAS AMC's Lewek Constellation Completes Inaugural Reel Lay Projects] | # [http://killajoules.wikidot.com/blog:6026 Ezra's Subsea Services Division, EMAS AMC's Lewek Constellation Completes Inaugural Reel Lay Projects] | ||
# [http://killajoules.wikidot.com/blog:6069 W&T Offshore Announces First Production at Big Bend Field] | # [http://killajoules.wikidot.com/blog:6069 W&T Offshore Announces First Production at Big Bend Field] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:USA]] | ||
+ | [[category:Murphy]] |
Latest revision as of 17:05, 21 January 2024
Contents
Summary Information
- Operator: Murphy Oil
- Country: USA
- Location: Mississippi Canyon Block 734 in the Gulf of Mexico
- Production start: 2009
- Partners: Murphy Oil - 37.5%, ENI - 25%, Statoil - 25%, Marubeni - 12.5%
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- A semi-submersible floating production unit with production capacity of 45,000 barrels of oil per day and 70 million cubic feet per day of natural gas is being utilized.
- The field will initially produce from three subsea wells connected via flow lines to the facility, which is installed in 6,050 feet of water
- The Big Bend and Dantzler Oil and Gas Field are tiedback to Thunder Hawk platform
- The Big Bend field is 18 miles from the Thunder Hawk platform in 7,200 feet of water in Mississippi Canyon Block 698
- The Dantzler field is 7 miles from the Thunder Hawk platform in 6,580 feet of water in Mississippi Canyon Block 782
Contractors
- **SBM Offshore:** Supply and operation of Semi-submersible production unit
- **Kiewit:** Semi-submersible hull construction
- **Derescom:** Glycol regeneration package, 60mmscfd, 1,960psig operating pressure
- **Aker Kvaerner:** Installation of the spread mooring system, transportation and hook up of the FPU
- **First Subsea:** Installation of the twelve mooring connectors
Big Bend & Dantzler
- **EMAS AMC:** Engineering, procurement, construction and installation of subsea tie-backs
History
- 2004 - Thunder Hawk Oil And Gas Field discovered
- 2005 - Hydro acquires a 25% stake
- 2006 - Marubeni acquired a stake from Pioneer
- 2007 - Eni acquired 25% stake from Dominion resources
- 2009 - Production commences
- 2014 - SBM signed production handling agreement for the Big Bend & Dantzler Fields
- 2015 - W&T Offshore Announces First Production at Big Bend
Geology
Links
- Gulf Of Mexico Permanent Deepwater Structures
- Gulf Of Mexico Discoveries In Water Depths Greater Than 5000
- Derescom Oil And Gas Processing References
- Dominion Exploration & Production Announces Discovery at Thunder Hawk
- Hydro and Spinnaker: A perfect fit
- Pioneer Closes Sale of Deepwater Gulf of Mexico Assets
- Eni completes the acquisition of Dominion's assets in the Gulf of Mexico
- Aker Kvaerner secures another floater installation contract in Gulf of Mexico
- First Subsea Completes Thunder Hawk Mooring Connections
- Murphy Oil Announces First Production At The Thunder Hawk Field In The Gulf Of Mexico
- SBM Offshore Announces Thunder Hawk Tiebacks
- Ezra's Subsea Services Division Finalises Triple Contract Signings With Noble Energy For Subsea Tie-Back Projects In The US Gulf Of Mexico
- Ezra's Subsea Services Division, EMAS AMC's Lewek Constellation Completes Inaugural Reel Lay Projects
- W&T Offshore Announces First Production at Big Bend Field