Thang Long and Dong Do Oil Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: PetroVietnam
  • Country: Vietnam
  • Location: Block 15-2
  • Production start: 2014
  • Partners: PetroVietnam 50%, Petronas 50%
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

+++ Description

+++ Contractors

  • **Keppel:** FPSO conversion
  • **PTSC:** 2 wellhead platforms, with topsides weighing approximately 1,100 per each, 15km infield pipeline and 87 ton PLEMs (Pipeline End Manifold) and PLET (Pipeline End Termination)

+++ History

  • 2011 - MOU signed for provision of FPSO
  • 2014 - Production starts

+++ Geology

+++ Links

  1. PTSC M&C wins a $ 113 million contract in Vietnam
  2. Head of agreement signed between Lam Son JOC & PTSC for the provision of FPSO for the development of Thang Long – Dong Do field
  3. Yinson's Floating Production, Storage and Offloading ("FPSO") PTSC Lam Son Starts Production