Texas LNG Export Terminal Project

From A Barrel Full
Revision as of 16:53, 12 January 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Ownership: Texas LNG
  • Website: https://txlng.com/
  • Location: Port of Brownsville in Brownsville, Texas
  • Capacity: 4.0 million tons/annum
  • Status: Planned

Brief Description

  • Texas LNG will construct, own, and operate a Liquefied Natural Gas (LNG) facility to be constructed at the Port of Brownsville in Brownsville, Texas. Texas LNG will have a permitted capacity to produce 4 MTA (million tonnes per annum) Liquefied Natural Gas (LNG) from approximately 600 MMcf/d or 0.6 Bcf/d of feed gas sourced from the extensive US natural gas system.
  • The project will have two trains using the standard Air Products liquefaction technology producing 2 MTA each.

Technical Details

  • Storage capacity:
  • Constructor:
    • Samsung Engineering, Technip Energies: Lead project contractor charged with project design and delivery
  • Licensor: Air Products

Ongoing Projects/Project Status

  • Final Investment Decision (FID) for the development of the Texas LNG liquefaction project is expected in 2022
  • Commissioning is expected in 2026

Suppliers / Customers

  • Suppliers:
  • Customers: EQT - Tolling agreement for 0.5 mtpa, 15 years

History

  • 2015 - Texas LNG begun the US Government FERC pre-Filing process
  • 2017 - Non binding sales contracts signed with Asian buyers
  • 2019 - Final FERC Order authorizing construction and operation
  • 2022 - Technip Energies and Samsung Engineering Awarded Pre-FID Engineering Contract
  • 2024 - EQT signed a tolling agreement for 0.5 mtpa

Other Information

  • -

Links

  1. Texas LNG Executes Term Sheets Exceeding 3 MTA With Asian LNG Buyers; Phase 2 Marketing Underway
  2. Technip Energies and Samsung Engineering Awarded Pre-FID Contract, Form Joint Venture for Project Design and Delivery for Texas LNG in the USA
  3. EQT Announces Tolling Agreement with Texas LNG