Difference between revisions of "Texas LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: Texas LNG |
− | * Website: | + | * Website: https://txlng.com/ |
− | * Location: | + | * Location: Port of Brownsville in Brownsville, Texas |
− | * Capacity: million tons/annum | + | * Capacity: 4.0 million tons/annum |
− | * Status: | + | * Status: Planned |
=== Brief Description === | === Brief Description === | ||
Line 13: | Line 13: | ||
=== Technical Details === | === Technical Details === | ||
* Storage capacity: | * Storage capacity: | ||
− | * Constructor: | + | * Constructor: |
+ | ** Samsung Engineering, Technip Energies: Lead project contractor charged with project design and delivery | ||
* Licensor: Air Products | * Licensor: Air Products | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | * Commissioning is expected in [[LNG Terminals to be Completed in | + | * Final Investment Decision (FID) for the development of the Texas LNG liquefaction project is expected in 2024 |
+ | * Commissioning is expected in [[LNG Terminals to be Completed in 2028 | 2028]] | ||
=== Suppliers / Customers === | === Suppliers / Customers === | ||
* Suppliers: | * Suppliers: | ||
* Customers: | * Customers: | ||
+ | ** EQT - Tolling agreements for 0.5 + 1.5 mtpa, 15 years | ||
+ | ** Gunvor - 20-year LNG FOB sale and purchase agreement (“SPA”) for 0.5 MTPA of LNG | ||
=== History === | === History === | ||
− | * - | + | * 2015 - Texas LNG begun the US Government FERC pre-Filing process |
+ | * 2017 - Non binding sales contracts signed with Asian buyers | ||
+ | * 2019 - Final FERC Order authorizing construction and operation | ||
+ | * 2022 - Technip Energies and Samsung Engineering Awarded Pre-FID Engineering Contract | ||
+ | * 2024 - EQT and Gunvor signed tolling agreements for 2.0 mtpa and 0.5 mtpa respectively | ||
=== Other Information === | === Other Information === | ||
Line 30: | Line 38: | ||
=== Links === | === Links === | ||
− | # | + | # [https://abarrelfull.blogspot.com/2022/01/texas-lng-executes-term-sheets.html Texas LNG Executes Term Sheets Exceeding 3 MTA With Asian LNG Buyers; Phase 2 Marketing Underway] |
+ | # [https://abarrelfull.blogspot.com/2022/11/technip-energies-and-samsung.html Technip Energies and Samsung Engineering Awarded Pre-FID Contract, Form Joint Venture for Project Design and Delivery for Texas LNG in the USA] | ||
+ | # [https://lng-news.blogspot.com/2024/01/eqt-announces-tolling-agreement-with.html EQT Announces Tolling Agreement with Texas LNG] | ||
+ | # [https://lng-news.blogspot.com/2024/03/glenfarne-energy-transitions-texas-lng.html Glenfarne Energy Transition’s Texas LNG Announces LNG Offtake Agreement with Gunvor Group] | ||
+ | # [https://lng-news.blogspot.com/2024/04/glenfarne-energy-transitions-texas-lng.html Glenfarne Energy Transition’s Texas LNG Sells Over Half of Offtake with an Additional LNG Tolling Agreement with EQT] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:USA]] | [[category:USA]] |
Latest revision as of 16:33, 25 April 2024
Contents
Summary Information
- Ownership: Texas LNG
- Website: https://txlng.com/
- Location: Port of Brownsville in Brownsville, Texas
- Capacity: 4.0 million tons/annum
- Status: Planned
Brief Description
- Texas LNG will construct, own, and operate a Liquefied Natural Gas (LNG) facility to be constructed at the Port of Brownsville in Brownsville, Texas. Texas LNG will have a permitted capacity to produce 4 MTA (million tonnes per annum) Liquefied Natural Gas (LNG) from approximately 600 MMcf/d or 0.6 Bcf/d of feed gas sourced from the extensive US natural gas system.
- The project will have two trains using the standard Air Products liquefaction technology producing 2 MTA each.
Technical Details
- Storage capacity:
- Constructor:
- Samsung Engineering, Technip Energies: Lead project contractor charged with project design and delivery
- Licensor: Air Products
Ongoing Projects/Project Status
- Final Investment Decision (FID) for the development of the Texas LNG liquefaction project is expected in 2024
- Commissioning is expected in 2028
Suppliers / Customers
- Suppliers:
- Customers:
- EQT - Tolling agreements for 0.5 + 1.5 mtpa, 15 years
- Gunvor - 20-year LNG FOB sale and purchase agreement (“SPA”) for 0.5 MTPA of LNG
History
- 2015 - Texas LNG begun the US Government FERC pre-Filing process
- 2017 - Non binding sales contracts signed with Asian buyers
- 2019 - Final FERC Order authorizing construction and operation
- 2022 - Technip Energies and Samsung Engineering Awarded Pre-FID Engineering Contract
- 2024 - EQT and Gunvor signed tolling agreements for 2.0 mtpa and 0.5 mtpa respectively
Other Information
- -
Links
- Texas LNG Executes Term Sheets Exceeding 3 MTA With Asian LNG Buyers; Phase 2 Marketing Underway
- Technip Energies and Samsung Engineering Awarded Pre-FID Contract, Form Joint Venture for Project Design and Delivery for Texas LNG in the USA
- EQT Announces Tolling Agreement with Texas LNG
- Glenfarne Energy Transition’s Texas LNG Announces LNG Offtake Agreement with Gunvor Group
- Glenfarne Energy Transition’s Texas LNG Sells Over Half of Offtake with an Additional LNG Tolling Agreement with EQT