Difference between revisions of "Texas LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 18: | Line 18: | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | * Final Investment Decision (FID) for the development of the Texas LNG liquefaction project is expected in | + | * Final Investment Decision (FID) for the development of the Texas LNG liquefaction project is expected in 2024 |
− | * Commissioning is expected in [[LNG Terminals to be Completed in | + | * Commissioning is expected in [[LNG Terminals to be Completed in 2028 | 2028]] |
=== Suppliers / Customers === | === Suppliers / Customers === | ||
* Suppliers: | * Suppliers: | ||
− | * Customers: EQT - Tolling agreement for 0.5 mtpa, 15 years | + | * Customers: |
+ | ** EQT - Tolling agreement for 0.5 mtpa, 15 years | ||
+ | ** Gunvor - 20-year LNG FOB sale and purchase agreement (“SPA”) for 0.5 MTPA of LNG | ||
=== History === | === History === | ||
Line 30: | Line 32: | ||
* 2019 - Final FERC Order authorizing construction and operation | * 2019 - Final FERC Order authorizing construction and operation | ||
* 2022 - Technip Energies and Samsung Engineering Awarded Pre-FID Engineering Contract | * 2022 - Technip Energies and Samsung Engineering Awarded Pre-FID Engineering Contract | ||
− | * 2024 - EQT signed | + | * 2024 - EQT and Ginvor signed tolling agreements for 0.5 mtpa each |
=== Other Information === | === Other Information === | ||
Line 39: | Line 41: | ||
# [https://abarrelfull.blogspot.com/2022/11/technip-energies-and-samsung.html Technip Energies and Samsung Engineering Awarded Pre-FID Contract, Form Joint Venture for Project Design and Delivery for Texas LNG in the USA] | # [https://abarrelfull.blogspot.com/2022/11/technip-energies-and-samsung.html Technip Energies and Samsung Engineering Awarded Pre-FID Contract, Form Joint Venture for Project Design and Delivery for Texas LNG in the USA] | ||
# [https://lng-news.blogspot.com/2024/01/eqt-announces-tolling-agreement-with.html EQT Announces Tolling Agreement with Texas LNG] | # [https://lng-news.blogspot.com/2024/01/eqt-announces-tolling-agreement-with.html EQT Announces Tolling Agreement with Texas LNG] | ||
+ | # [https://lng-news.blogspot.com/2024/03/glenfarne-energy-transitions-texas-lng.html Glenfarne Energy Transition’s Texas LNG Announces LNG Offtake Agreement with Gunvor Group] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:USA]] | [[category:USA]] |
Revision as of 11:48, 19 March 2024
Contents
Summary Information
- Ownership: Texas LNG
- Website: https://txlng.com/
- Location: Port of Brownsville in Brownsville, Texas
- Capacity: 4.0 million tons/annum
- Status: Planned
Brief Description
- Texas LNG will construct, own, and operate a Liquefied Natural Gas (LNG) facility to be constructed at the Port of Brownsville in Brownsville, Texas. Texas LNG will have a permitted capacity to produce 4 MTA (million tonnes per annum) Liquefied Natural Gas (LNG) from approximately 600 MMcf/d or 0.6 Bcf/d of feed gas sourced from the extensive US natural gas system.
- The project will have two trains using the standard Air Products liquefaction technology producing 2 MTA each.
Technical Details
- Storage capacity:
- Constructor:
- Samsung Engineering, Technip Energies: Lead project contractor charged with project design and delivery
- Licensor: Air Products
Ongoing Projects/Project Status
- Final Investment Decision (FID) for the development of the Texas LNG liquefaction project is expected in 2024
- Commissioning is expected in 2028
Suppliers / Customers
- Suppliers:
- Customers:
- EQT - Tolling agreement for 0.5 mtpa, 15 years
- Gunvor - 20-year LNG FOB sale and purchase agreement (“SPA”) for 0.5 MTPA of LNG
History
- 2015 - Texas LNG begun the US Government FERC pre-Filing process
- 2017 - Non binding sales contracts signed with Asian buyers
- 2019 - Final FERC Order authorizing construction and operation
- 2022 - Technip Energies and Samsung Engineering Awarded Pre-FID Engineering Contract
- 2024 - EQT and Ginvor signed tolling agreements for 0.5 mtpa each
Other Information
- -
Links
- Texas LNG Executes Term Sheets Exceeding 3 MTA With Asian LNG Buyers; Phase 2 Marketing Underway
- Technip Energies and Samsung Engineering Awarded Pre-FID Contract, Form Joint Venture for Project Design and Delivery for Texas LNG in the USA
- EQT Announces Tolling Agreement with Texas LNG
- Glenfarne Energy Transition’s Texas LNG Announces LNG Offtake Agreement with Gunvor Group