Difference between revisions of "Texas LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
=== Technical Details === | === Technical Details === | ||
* Storage capacity: | * Storage capacity: | ||
− | * Constructor: | + | * Constructor: Samsung Engineering: all technical & engineering services |
* Licensor: Air Products | * Licensor: Air Products | ||
Revision as of 14:13, 14 January 2022
Contents
Summary Information
- Ownership: Texas LNG
- Website: https://txlng.com/
- Location: Port of Brownsville in Brownsville, Texas
- Capacity: 4.0 million tons/annum
- Status: Planned
Brief Description
- Texas LNG will construct, own, and operate a Liquefied Natural Gas (LNG) facility to be constructed at the Port of Brownsville in Brownsville, Texas. Texas LNG will have a permitted capacity to produce 4 MTA (million tonnes per annum) Liquefied Natural Gas (LNG) from approximately 600 MMcf/d or 0.6 Bcf/d of feed gas sourced from the extensive US natural gas system.
- The project will have two trains using the standard Air Products liquefaction technology producing 2 MTA each.
Technical Details
- Storage capacity:
- Constructor: Samsung Engineering: all technical & engineering services
- Licensor: Air Products
Ongoing Projects/Project Status
- Final Investment Decision (FID) for the development of the Texas LNG liquefaction project is expected in 2022
- Commissioning is expected in 2026
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2015 - Texas LNG begun the US Government FERC pre-Filing process
- 2019 - Final FERC Order authorizing construction and operation
Other Information
- -
Links
- -