Teesside Gas Processing Plant (TGPP)

From A Barrel Full
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • The Teesside Gas Processing Plant consists of two gas processing trains with a combined capacity to process up to 675 million cubic feet of gas per day
  • Natural gas processed in TGPP originates from oil and gas fields in the North Sea. It is transported to the Teesside Gas Processing Plant via the CATS Central Area Transmission System Gas Pipeline and from the Breagh pipeline

++++ Related Oil and Gas Fields

+++ Ongoing Projects

  • -

+++ Other Information

  • -

+++ History

  • 1993 - The plant was commissioned
  • 2013 - Breagh & Jasmine come onstream

+++ Relevant Links

  1. RWE Dea UK starts production from the Breagh gas field
  2. First gas production from UK Jasmine field