Tazama Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Dar es Salaam, Tanzania
  • Destination: Indeni Petroleum Refinery, Zambia
  • Ownership: Zambian Government
  • Website:
  • Length: 1,710-kilometre (1,060 miles)
  • Capacity: 22,000 barrels of oil per day
  • Crude Type:

+++ The Route

  • There are seven oil pump stations

+++ Pipeline Status

  • In operation

+++ History

  • 1969 - Pipeline commissioned
  • 1991 - Rehabilitation project including repair and part replacement of existing 8" dia and 12" dia pipelines. The project was supported by the World Bank


+++ Other Information

  • The same engines that were installed 40 years ago are still in operation at the pumping stations
  • The pipeline is in dire need of rehabilitation

+++ Links