Taurt Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: BP
  • Country: Egypt
  • Location: Ras El Barr (REB) concession
  • Production start: 2008
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Taurt is part of the Ras El Barr Concession Oil and Gas Fields
  • The Taurt project is an offshore development with a Subsea Production System (SPS), two subsea wells, and a 70 kilometre pipeline and control umbilical back to upgraded facilities at the existing West Harbor Gas Processing Plant

+++ Contractors

  • **Genesis:** Engineering and project support,
  • **ENPPI:** Onshore modifications design, Petrojet for the onshore modification and subsea structure construction,
  • **PMS and Allseas:** Offshore pipeline installation,
  • **Cameron:** SPS supply,
  • **Aker Solutions:** Umbilical supply,
  • **Sonsub:** Offshore construction,
  • **Five Ocean Services:** Umbilical installation
  • **Universalpegasus:** Technical support, expediting, procurement and project management services

+++ History

  • 2004 - Taurt Gas Field discovered
  • 2008 - First gas produced

+++ Geology

+++ Links

  1. Aker Solutions Umbilical References
  2. Serimax Africa Pipeline References
  3. Universalpegasus Subsea References
  4. BP Egypt Announces Taurt Discovery In Eastern Nile Delta
  5. BP Starts Production from Taurt