Tanzania LNG Terminal Project

From A Barrel Full
Revision as of 11:09, 27 June 2022 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • A large onshore liquefaction plant is planned

+++ Technical Details

  • Storage capacity:
  • Constructor:
* **KBR:** Pre-FEED Studies
  • Licensor:

+++ Ongoing Projects/Project Status

  • The project is uncretain, as Equinor impaired its assets in 2021

+++ Suppliers / Customers

+++ History

  • 2007 - Statoil was awarded the licence for Block 2
  • 2012 - KBR Selected to Execute Pre-FEED Studies
  • 2021 - Equinor decides to impair its Tanzanian assets

+++ Other Information

  • -

Links

  1. KBR Selected to Execute LNG Pre-FEED Studies in Tanzania, East Africa

https://abarrelfull.blogspot.com/2022/06/impairment-at-tanzania-lng-project.html Impairment at Tanzania LNG Project]