Difference between revisions of "Tanzania LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Statoil * Website: http://www.statoil.com/ * Location: * Capacity: million tons/annum * Status: Planned +++ Brief Description * - +++ T...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Ownership: | + | * Ownership: Equinor |
− | * Website: | + | * Website: https://www.equinor.com/ |
* Location: | * Location: | ||
* Capacity: million tons/annum | * Capacity: million tons/annum | ||
Line 8: | Line 8: | ||
+++ Brief Description | +++ Brief Description | ||
− | * | + | * A large onshore liquefaction plant is planned |
+++ Technical Details | +++ Technical Details | ||
Line 17: | Line 17: | ||
+++ Ongoing Projects/Project Status | +++ Ongoing Projects/Project Status | ||
− | * | + | * The project is uncretain, as Equinor impaired its assets in 2021 |
+++ Suppliers / Customers | +++ Suppliers / Customers | ||
− | * Suppliers: | + | * Suppliers: Gas will be supplied from the [[Tanzania Block 2 Gas Fields]] |
* Customers: | * Customers: | ||
Line 26: | Line 26: | ||
* 2007 - Statoil was awarded the licence for Block 2 | * 2007 - Statoil was awarded the licence for Block 2 | ||
* 2012 - KBR Selected to Execute Pre-FEED Studies | * 2012 - KBR Selected to Execute Pre-FEED Studies | ||
+ | * 2021 - Equinor decides to impair its Tanzanian assets | ||
+++ Other Information | +++ Other Information | ||
* - | * - | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/blog:3206 KBR Selected to Execute LNG Pre-FEED Studies in Tanzania, East Africa] | # [http://killajoules.wikidot.com/blog:3206 KBR Selected to Execute LNG Pre-FEED Studies in Tanzania, East Africa] | ||
+ | https://abarrelfull.blogspot.com/2022/06/impairment-at-tanzania-lng-project.html Impairment at Tanzania LNG Project] |
Revision as of 11:09, 27 June 2022
Summary Information
- Ownership: Equinor
- Website: https://www.equinor.com/
- Location:
- Capacity: million tons/annum
- Status: Planned
+++ Brief Description
- A large onshore liquefaction plant is planned
+++ Technical Details
- Storage capacity:
- Constructor:
* **KBR:** Pre-FEED Studies
- Licensor:
+++ Ongoing Projects/Project Status
- The project is uncretain, as Equinor impaired its assets in 2021
+++ Suppliers / Customers
- Suppliers: Gas will be supplied from the Tanzania Block 2 Gas Fields
- Customers:
+++ History
- 2007 - Statoil was awarded the licence for Block 2
- 2012 - KBR Selected to Execute Pre-FEED Studies
- 2021 - Equinor decides to impair its Tanzanian assets
+++ Other Information
- -
Links
https://abarrelfull.blogspot.com/2022/06/impairment-at-tanzania-lng-project.html Impairment at Tanzania LNG Project]