Difference between revisions of "Tanzania LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
* Storage capacity: | * Storage capacity: | ||
* Constructor: | * Constructor: | ||
− | + | ** **KBR:** Pre-FEED Studies | |
* Licensor: | * Licensor: | ||
Latest revision as of 13:22, 17 September 2022
Summary Information
- Ownership: Equinor
- Website: https://www.equinor.com/
- Location:
- Capacity: million tons/annum
- Status: Planned
+++ Brief Description
- A large onshore liquefaction plant is planned
+++ Technical Details
- Storage capacity:
- Constructor:
- **KBR:** Pre-FEED Studies
- Licensor:
+++ Ongoing Projects/Project Status
- The project is uncretain, as Equinor impaired its assets in 2021
+++ Suppliers / Customers
- Suppliers: Gas will be supplied from the Tanzania Block 2 Gas Fields
- Customers:
+++ History
- 2007 - Statoil was awarded the licence for Block 2
- 2012 - KBR Selected to Execute Pre-FEED Studies
- 2021 - Equinor decides to impair its Tanzanian assets
+++ Other Information
- -