Tangguh Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: BP
  • Country: Indonesia
  • Location: Irian Jaya, Eastern Indonesia
  • Production start: 2009
  • Partners: BP / Pertamina
  • Type: Gas
  • Estimated Reserves: 13 Trillion ft3 (Original)
  • Production Volume:

Description

  • Tangguh is a collection of gas fields in the Wiriagar, Berau and Muturi production sharing contracts (PSCs)
  • The field used to be named **Vorwata**
  • The field is the main supplier of the Tangguh LNG Terminal
  • It utilises 3 offshore platforms

+++ Contractors

  • **Saipem:**
    • Engineering, procurement, fabrication and installation of two platforms and two pipelines
  • **KWSubsea:** Preliminary design of the wet insulated 20km pipeline
  • **Tripatra:** FEED for Tangguh Gas Production Facilities

+++ History

  • 1987 - Production-sharing contract signed for Berau block
  • 1995 - ARCO discovered the field
  • 1996 - Arco discovers Wiriagar
  • 1996 - Reserves were estimated to be 13 Trillion Cubic Feet of Gas
  • 2005 - Saipem awarded platform contracts
  • 2007 - BP begins drilling production wells
  • 2009 - First production

+++ Geology

+++ Links

  1. [[[Saipem Fixed Offshore Production Facilities Project References]]]
  2. [[[KWSubsea Subsea References]]]
  3. [[[Tripatra Platform References]]]
  4. Atlantic Richfield Berau Tests Natural Gas in Bintuni Bay, Indonesia
  5. ARCO Announces Successful Test of Wiriagar Deep-3 Appraisal Well in Indonesia
  6. ARCO Confirms At Least 13 Trillion Cubic Feet of Gas Reserves in Eastern Indonesia; Discovery is Third Largest in ARCO's History
  7. Saipem wins 550 million USD offshore contracts
  8. Bp To Drill 15 Wells In Tangguh