Difference between revisions of "Tangguh Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: BP * Country: Indonesia * Location: Irian Jaya, Eastern Indonesia * Production start: 2009 * Partners: BP / Pertamina * Type: Gas * Est...") |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* Tangguh is a collection of gas fields in the Wiriagar, Berau and Muturi production sharing contracts (PSCs) | * Tangguh is a collection of gas fields in the Wiriagar, Berau and Muturi production sharing contracts (PSCs) | ||
* The field used to be named **Vorwata** | * The field used to be named **Vorwata** | ||
− | * The field is the main supplier of the | + | * The field is the main supplier of the [[Tangguh LNG Terminal]] |
* It utilises 3 offshore platforms | * It utilises 3 offshore platforms | ||
+++ Contractors | +++ Contractors | ||
* **Saipem:** | * **Saipem:** | ||
− | + | ** Engineering, procurement, fabrication and installation of two platforms and two pipelines | |
* **KWSubsea:** Preliminary design of the wet insulated 20km pipeline | * **KWSubsea:** Preliminary design of the wet insulated 20km pipeline | ||
* **Tripatra:** FEED for Tangguh Gas Production Facilities | * **Tripatra:** FEED for Tangguh Gas Production Facilities | ||
Line 29: | Line 29: | ||
* 2007 - BP begins drilling production wells | * 2007 - BP begins drilling production wells | ||
* 2009 - First production | * 2009 - First production | ||
+ | * 2022 - PSC extended from 2035 to 2055 | ||
+++ Geology | +++ Geology | ||
* | * | ||
− | + | === Links === | |
− | # | + | # [[Saipem Fixed Offshore Production Facilities Project References]] |
− | # | + | # [[KWSubsea Subsea References]] |
− | # | + | # [[Tripatra Platform References]] |
# [http://killajoules.wikidot.com/archive:atlantic-richfield-berau-tests-natural-gas-in-bintun Atlantic Richfield Berau Tests Natural Gas in Bintuni Bay, Indonesia] | # [http://killajoules.wikidot.com/archive:atlantic-richfield-berau-tests-natural-gas-in-bintun Atlantic Richfield Berau Tests Natural Gas in Bintuni Bay, Indonesia] | ||
# [http://killajoules.wikidot.com/archive:arco-announces-successful-test-of-wiriagar-deep-3-ap ARCO Announces Successful Test of Wiriagar Deep-3 Appraisal Well in Indonesia] | # [http://killajoules.wikidot.com/archive:arco-announces-successful-test-of-wiriagar-deep-3-ap ARCO Announces Successful Test of Wiriagar Deep-3 Appraisal Well in Indonesia] | ||
Line 42: | Line 43: | ||
# [http://killajoules.wikidot.com/archive:saipem-wins-550-million-usd-offshore-contracts Saipem wins 550 million USD offshore contracts] | # [http://killajoules.wikidot.com/archive:saipem-wins-550-million-usd-offshore-contracts Saipem wins 550 million USD offshore contracts] | ||
# [http://killajoules.wikidot.com/archive:bp-to-drill-15-wells-in-tangguh/ Bp To Drill 15 Wells In Tangguh] | # [http://killajoules.wikidot.com/archive:bp-to-drill-15-wells-in-tangguh/ Bp To Drill 15 Wells In Tangguh] | ||
+ | # [https://a-barrel-full.blogspot.com/2022/12/bp-looks-to-further-developments-at.html bp looks to further developments at Tangguh with PSC extension] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Indonesia]] | ||
+ | [[category:BP]] |
Latest revision as of 09:28, 30 December 2022
Summary Information
- Operator: BP
- Country: Indonesia
- Location: Irian Jaya, Eastern Indonesia
- Production start: 2009
- Partners: BP / Pertamina
- Type: Gas
- Estimated Reserves: 13 Trillion ft3 (Original)
- Production Volume:
Description
- Tangguh is a collection of gas fields in the Wiriagar, Berau and Muturi production sharing contracts (PSCs)
- The field used to be named **Vorwata**
- The field is the main supplier of the Tangguh LNG Terminal
- It utilises 3 offshore platforms
+++ Contractors
- **Saipem:**
- Engineering, procurement, fabrication and installation of two platforms and two pipelines
- **KWSubsea:** Preliminary design of the wet insulated 20km pipeline
- **Tripatra:** FEED for Tangguh Gas Production Facilities
+++ History
- 1987 - Production-sharing contract signed for Berau block
- 1995 - ARCO discovered the field
- 1996 - Arco discovers Wiriagar
- 1996 - Reserves were estimated to be 13 Trillion Cubic Feet of Gas
- 2005 - Saipem awarded platform contracts
- 2007 - BP begins drilling production wells
- 2009 - First production
- 2022 - PSC extended from 2035 to 2055
+++ Geology
Links
- Saipem Fixed Offshore Production Facilities Project References
- KWSubsea Subsea References
- Tripatra Platform References
- Atlantic Richfield Berau Tests Natural Gas in Bintuni Bay, Indonesia
- ARCO Announces Successful Test of Wiriagar Deep-3 Appraisal Well in Indonesia
- ARCO Confirms At Least 13 Trillion Cubic Feet of Gas Reserves in Eastern Indonesia; Discovery is Third Largest in ARCO's History
- Saipem wins 550 million USD offshore contracts
- Bp To Drill 15 Wells In Tangguh
- bp looks to further developments at Tangguh with PSC extension