Difference between revisions of "Tangguh Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: BP * Country: Indonesia * Location: Irian Jaya, Eastern Indonesia * Production start: 2009 * Partners: BP / Pertamina * Type: Gas * Est...") |
Abarrelfull (talk | contribs) |
||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* Tangguh is a collection of gas fields in the Wiriagar, Berau and Muturi production sharing contracts (PSCs) | * Tangguh is a collection of gas fields in the Wiriagar, Berau and Muturi production sharing contracts (PSCs) | ||
* The field used to be named **Vorwata** | * The field used to be named **Vorwata** | ||
− | * The field is the main supplier of the | + | * The field is the main supplier of the [[Tangguh LNG Terminal]] |
* It utilises 3 offshore platforms | * It utilises 3 offshore platforms | ||
+++ Contractors | +++ Contractors | ||
* **Saipem:** | * **Saipem:** | ||
− | + | ** Engineering, procurement, fabrication and installation of two platforms and two pipelines | |
* **KWSubsea:** Preliminary design of the wet insulated 20km pipeline | * **KWSubsea:** Preliminary design of the wet insulated 20km pipeline | ||
* **Tripatra:** FEED for Tangguh Gas Production Facilities | * **Tripatra:** FEED for Tangguh Gas Production Facilities |
Revision as of 09:02, 19 November 2021
Summary Information
- Operator: BP
- Country: Indonesia
- Location: Irian Jaya, Eastern Indonesia
- Production start: 2009
- Partners: BP / Pertamina
- Type: Gas
- Estimated Reserves: 13 Trillion ft3 (Original)
- Production Volume:
Description
- Tangguh is a collection of gas fields in the Wiriagar, Berau and Muturi production sharing contracts (PSCs)
- The field used to be named **Vorwata**
- The field is the main supplier of the Tangguh LNG Terminal
- It utilises 3 offshore platforms
+++ Contractors
- **Saipem:**
- Engineering, procurement, fabrication and installation of two platforms and two pipelines
- **KWSubsea:** Preliminary design of the wet insulated 20km pipeline
- **Tripatra:** FEED for Tangguh Gas Production Facilities
+++ History
- 1987 - Production-sharing contract signed for Berau block
- 1995 - ARCO discovered the field
- 1996 - Arco discovers Wiriagar
- 1996 - Reserves were estimated to be 13 Trillion Cubic Feet of Gas
- 2005 - Saipem awarded platform contracts
- 2007 - BP begins drilling production wells
- 2009 - First production
+++ Geology
+++ Links
- [[[Saipem Fixed Offshore Production Facilities Project References]]]
- [[[KWSubsea Subsea References]]]
- [[[Tripatra Platform References]]]
- Atlantic Richfield Berau Tests Natural Gas in Bintuni Bay, Indonesia
- ARCO Announces Successful Test of Wiriagar Deep-3 Appraisal Well in Indonesia
- ARCO Confirms At Least 13 Trillion Cubic Feet of Gas Reserves in Eastern Indonesia; Discovery is Third Largest in ARCO's History
- Saipem wins 550 million USD offshore contracts
- Bp To Drill 15 Wells In Tangguh