Difference between revisions of "Taiga Oil Sands Project"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Osum Oil Sands * Country: Canada * Location: Cold Lake, Alberta * Production start: * Partners: * Type: Bitumen * Estimated Reserves: 359 m...")
 
 
Line 14: Line 14:
 
+++ Contractors
 
+++ Contractors
 
* **Aker Solutions:**
 
* **Aker Solutions:**
* FWKO (split flow) c/w internals (cyclone inlet device, transverse baffle s, perforated baffles with anti skim and matrix packs
+
** FWKO (split flow) c/w internals (cyclone inlet device, transverse baffle s, perforated baffles with anti skim and matrix packs
* Mechanical Treater (end flow) c/w all internals, including transverse baffles, perforated baffles with anti skim and matrix packs
+
** Mechanical Treater (end flow) c/w all internals, including transverse baffles, perforated baffles with anti skim and matrix packs
  
 
+++ History
 
+++ History

Latest revision as of 08:28, 6 November 2023

Summary Information

  • Operator: Osum Oil Sands
  • Country: Canada
  • Location: Cold Lake, Alberta
  • Production start:
  • Partners:
  • Type: Bitumen
  • Estimated Reserves: 359 million barrels of proved plus probable reserves
  • Production Volume:

+++ Description

  • The Taiga Project is located in the prolific Cold Lake region of Alberta adjacent to some of the largest thermal projects in Canada. The project has been assigned 359 million barrels of proved plus probable reserves and 105 million barrels of best estimate contingent resource, which may support up to 45,000 barrels per day of production for over 30 years.

+++ Contractors

  • **Aker Solutions:**
    • FWKO (split flow) c/w internals (cyclone inlet device, transverse baffle s, perforated baffles with anti skim and matrix packs
    • Mechanical Treater (end flow) c/w all internals, including transverse baffles, perforated baffles with anti skim and matrix packs

+++ History

  • 2010 - Application made to the Alberta Environment and the Alberta Energy Resources Conservation Board

+++ Geology

+++ Links

  1. Aker Solutions Oil And Gas Processing References
  2. Osum Files Commercial Application for the Taiga Project
  3. Osum’s Taiga Project Receives Approval from the ERCB