Tabu Oil and Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Exxon Mobil
  • Country: Malaysia
  • Location:
  • Production start:
  • Partners:
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field is producing oil from the Tabu field via two platforms, the Tabu A and Tabu B platforms, installed in 1986 and 1995 respectively
  • The fields began producing gas following the completion of the NAG project

+++ Contractors

  • **Hyundai Heavy Industries:** Fabrication of the Tabu A Platform
  • **TL Offshore:** Pipelines for NAG project

+++ History

  • 1986 - Tabu A platform was installed
  • 1995 - Tabu B platform was added
  • 2007 - Gas production started
  • 2009 - New PSC signed for field

+++ Geology

+++ Links

  1. International Protective Coatings Fixed Platform References
  2. Serimax Pipeline References
  3. ExxonMobil unit starts gas output at Tabu
  4. Petronas Signs New PSC With Exxonmobil And Petronas Carigali