TECNA Refinery References

From A Barrel Full
Jump to navigation Jump to search
  1. La Plata Refinery - Catalytic Cracking Revamp Project
    • Repsol - YPF
    • Summary: Replacement of Reactor Cyclones, Increment Residue Processing Capacity, Increment Air Consumption for Burners, lift and fluffing, Upgrades in FCC Fractionation Train
    • Schedule: September 2006 – February 2008 (17 months)
    • Scope: Basic Engineering Verification, Detail Engineering, Procurement, Fabrication, Construction, Commissioning, Start Up Assistance
  2. La Plata Refinery - Coker Unit Revamping
    • Repsol - YPF
    • Summary: Processing Capacity: 185 m3,/h, Coke Storage Capacity: 12,500 ton,
    • Schedule: December 2007 – October 2008 (10 months)
    • Scope: FW Package Consistency Check Analysis, FEL 3 Coker Island, Basic Design & FEL 3 Off Sites, Basic Design & FEL 3 Coke Storage and Handling System, Fractionation and Gas Concentration, Systems Debottlenecking Study.
  3. Barrancabaermeja Santander Refinery - Consolidated Operations Center
    • Ecopetrol
    • Summary: The main objective is to have an unified control room for the whole refinery.
    • Scope: EPC contract, Detail engineering, Procurement, Construction, Commissioning and start up
  4. La Plata Refinery - FCC Gasoline Splitter
    • Repsol - YPF
    • Summary: Processing Capacity: 4,800 m3/d (30,200 bpd)
    • Schedule: June 2004 – November 2005 (Phase 1: 18 months), June 2005 – May 2006 (Phase 2: 12 months)
    • Scope: Basic Engineering Completion, Detailed Engineering, Procurement, Fabrication, Site Erection, Commissioning, Start Up Assistance
  5. Refinery Process Scheme Study
  6. Lujan De Cuyo Refinery - Splitter Unit
    • YPF
    • Summary: FCC Naphtha Capacity: 60 m3/h (9060 bpd), Produce new cut points for HDS unit,
    • Schedule: September 2005 – December 2006 (15 months)
    • Scope: Basic Engineering Verification, Detail Engineering, Procurement Instruments & Pumps, Precommissioning & Commissioning Assistance, Start Up Assistance
  7. Salamanca Refinery - Sulfur Recovery Unit
    • Pemex
    • Summary: Capacity: Sulfur recovery: 80 tn/day,
    • Schedule: Project award: March 2010, Start up: December 2012
    • Scope: Detail engineering, Management, Procurement, Fabrication, Transports, Construction, Precommissioning & commissioning,Start up
  8. Block 16 Oil Fields - Topping & Diesel Production Unit
    • Repsol
    • Summary: Heavy Crude Oil Production: 8,000 bpd
    • Schedule: December 1998
    • Scope: Basic & Detailed Engineering, Procurement, Construction, Erection, Commissioning & Precomissioning, Start Up & Test Run, Operation & Maintenance, BOT project
  9. Topping & Diesel Production Unit - Cerro Dragón
  10. San Lorenzo Refinery - Topping & Vacuum Fired Heaters
    • Petrobras
    • Summary: Three Fired Heaters for Topping Distillation Units I, II & III. & One Fired Heater for Vacuum Distillation
    • Schedule: July 2005 – December 2006 (17 months)
    • Scope: Engineering, Procurement, Fabrication, Construction, Commissioning, Start Up Assistance


++++ Links