Difference between revisions of "Suncor Edmonton Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Petro Canada (Suncor) * Website: http://www.petro-canada.ca/ (http://www.suncor.com/) * Location: Edmonton, Alberta * Capacity: 6.75 m...") |
Abarrelfull (talk | contribs) |
||
Line 3: | Line 3: | ||
* Website: http://www.petro-canada.ca/ (http://www.suncor.com/) | * Website: http://www.petro-canada.ca/ (http://www.suncor.com/) | ||
* Location: Edmonton, Alberta | * Location: Edmonton, Alberta | ||
− | * Capacity: | + | * Capacity: 7.1 million tons/annum & 142,000 bbl/day |
* Nelson Complexity: | * Nelson Complexity: | ||
+ | |||
=== Refining Units === | === Refining Units === | ||
* CDU, | * CDU, |
Revision as of 15:30, 29 March 2020
Contents
Summary Information
- Ownership: Petro Canada (Suncor)
- Website: http://www.petro-canada.ca/ (http://www.suncor.com/)
- Location: Edmonton, Alberta
- Capacity: 7.1 million tons/annum & 142,000 bbl/day
- Nelson Complexity:
Refining Units
- CDU,
- VDU,
- Fluidised catalytic cracking unit
- Delayed Coker
- Hydrotreater
- Sulphur Unit
- Steam Methane Reformer
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The refinery runs entirely on oil sands-based feedstocks
Products Produced
- Gasoline, Diesel, Jet Fuel, Petrocoke, Sulphur
Projects
-
Other Information
- Petro-Canada awarded Bantrel the EPC contract to convert this refinery to process bitumen-based feedstock from the company's oilsands extraction sites. The project was completed in 2008.
- The RCP involves the replacement of the existing process units: crude unit, vacuum unit, delayed coker, amine unit, sulphur plant and sour water stripping. In addition, a number of units were revamped and offsites and utilities added.
History
- 2004 - Air Products and Technip awarded hydrogen plant contract
- 2008 - Refinery upgrade project completed, enabling the refinery to switch to oil sands
- 2010 - Delayed coker project completed
- 2013 - KBR signs three year maintenance agreement