Difference between revisions of "Summit LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
Line 22: Line 22:
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
  
* Suppliers:
+
* Suppliers: Excelerate will deliver 0.85 MTPA of LNG in 2026 and 2027 and 1 MTPA from 2028 to 2040, shared between its two terminals
* Customers:
+
* Customers: A pipeline connects the liquefied natural gas (LNG) terminal to the national grid
  
 
=== History ===
 
=== History ===
Line 29: Line 29:
 
* 2017 - Summit entered into a 15-year charter agreement with Excelerate for the FSRU Summit LNG
 
* 2017 - Summit entered into a 15-year charter agreement with Excelerate for the FSRU Summit LNG
 
* 2019 - Terminal commissioned
 
* 2019 - Terminal commissioned
 +
* 2023 - Excelerate Energy and Petrobangla Sign Long-Term LNG Sale and Purchase Agreement
  
 
=== Other Information ===
 
=== Other Information ===
Line 35: Line 36:
 
=== Links ===
 
=== Links ===
 
# [https://abarrelfull.blogspot.com/2022/01/natural-gas-flows-from-summit-lng-month.html  Natural gas flows from 'Summit LNG' a month ahead of schedule]
 
# [https://abarrelfull.blogspot.com/2022/01/natural-gas-flows-from-summit-lng-month.html  Natural gas flows from 'Summit LNG' a month ahead of schedule]
 +
# [https://lng-news.blogspot.com/2023/11/excelerate-energy-and-petrobangla-sign.html Excelerate Energy and Petrobangla Sign Long-Term LNG Sale and Purchase Agreement]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Bangladesh]]
 
[[category:Bangladesh]]

Latest revision as of 12:29, 8 November 2023

Summary Information

Brief Description

  • The terminal includes the provision of Excelerate’s floating storage and regasification unit (FSRU), Summit LNG. The FSRU has 138,000 m3 of LNG storage capacity and a base regasification capacity of 500 million standard cubic feet per day.

Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:

Ongoing Projects/Project Status

  • The terminal was commissioned in 2019

Suppliers / Customers

  • Suppliers: Excelerate will deliver 0.85 MTPA of LNG in 2026 and 2027 and 1 MTPA from 2028 to 2040, shared between its two terminals
  • Customers: A pipeline connects the liquefied natural gas (LNG) terminal to the national grid

History

  • 2017 - Summit entered into a 15-year charter agreement with Excelerate for the FSRU Summit LNG
  • 2019 - Terminal commissioned
  • 2023 - Excelerate Energy and Petrobangla Sign Long-Term LNG Sale and Purchase Agreement

Other Information

-

Links

  1. Natural gas flows from 'Summit LNG' a month ahead of schedule
  2. Excelerate Energy and Petrobangla Sign Long-Term LNG Sale and Purchase Agreement