STEGAL Gas Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source:
  • Destination:
  • Ownership: Gascade
  • Website: https://www.gascade.de/
  • Length: 314 kilometres ( miles)
  • Capacity: per day
  • Status: Operating

Details

  • STEGAL (Sachsen-Thüringen-Erdgas-Anbindungsleitung, Saxony-Thuringia natural gas pipeline) connects the Czech and Slovakian pipeline systems for Russian natural gas to the MIDAL Gas Pipeline from Olbernhau in the state of Saxony.

History

  • 1991 - Construction started
  • 1992 - STEGAL began operations
  • 2006 - The STEGAL loop increased capacity

Other Information

  • -

Links

  1. Gascade, STEGAL