Burgas - Alexandroupolis Pipeline Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Burgas, Bulgaria
  • Destination: Alexandroupolis, Greece
  • Ownership: Trans Balkan Pipeline Company
  • Website: http://tbpipeline.com/
  • Length: kilometres ( miles)
  • Capacity: barrels of oil per day
  • Crude Type: Russian [[[Ural Crude Oil]]]

+++ The Route

  • Running South West from Burgas on the Black Sea coast of Bulgaria, to Alexandroupolis on the Northern coast of the Aegean Sea.

+++ Pipeline Status

  • ILF was awarded the design in 2008
  • The pipeline is expected to be in operation in 2013

+++ History

  • 2008 - ILF awarded project design
  • 2011 - The Bulgarian Ministry of Environment and Water gave a positive assessment to the project

+++ Other Information

  • The pipeline is one of a number of projects designed to bypass the [[[Bosphorus Straits]]]. The [[[Baku Tbilisi Ceyhan Pipeline]]] which began operations in 2006 is the only one in operation. The [[[Samsun Ceyhan Oil Pipeline]]] and [[[Constanta Trieste Oil pipeline]]] are two other alternatives


+++ Links