Southern Natural Gas Pipeline Company

From A Barrel Full
Revision as of 08:43, 4 June 2021 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: * Destination: * Ownership: Kinder Morgan * Website: http://www.kindermorgan.com/ * Length: kilometres (7,600 miles) * Capacity: pe...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Source:
  • Destination:
  • Ownership: Kinder Morgan
  • Website: http://www.kindermorgan.com/
  • Length: kilometres (7,600 miles)
  • Capacity: per day
  • Status: Operating

+++ Details

  • The 7,600 mile SNG system is made up of pipelines extending from natural gas supply basins in Texas, Louisiana, Mississippi, Alabama and the Gulf of Mexico to market areas in Louisiana, Mississippi, Alabama, Florida, Georgia, South Carolina and Tennessee, including the metropolitan areas of Atlanta and Birmingham.
  • It has interconnections with [[[Gulf South Gas Pipeline System]]] & [[[East Tennessee Natural Gas Pipeline]]]
  • SNG is the principal natural gas transporter to southeastern markets in Alabama, Georgia and South Carolina, which are part of one of the fastest growing natural gas demand regions in the United States.
  • The Cypress Pipeline is a 165 miles of 24-inch pipe from Effingham County, GA, to an intersection with [[[Florida Gas Transmission Pipeline]]]'s Jacksonville Lateral in Clay County, Florida
  • The SNG system is also connected to Southern LNG's [[[Elba Island LNG Terminal]]] near Savannah, Ga.
  • Gas is supplied by a number of sources including [[[Viosca Knoll Gas Pipeline System]]]

+++ Contractors

  • **Gulf Interstate Engineering:** Project management and engineering support for the FERC application phase of the Cypress Pipeline Project

+++ History

  • 1997 - Southern Zone 3 Expansion
  • 1998 - Southern Zone 2&3 Expansion & Dallas Lateral
  • 2000 - SSEE III Phase 2
  • 2001 - South GA Expansion & Wrens Station Expansion
  • 2002 - South Sys Expansion I Phase 1
  • 2003 - South Sys Expansion I Phase 2 & Expansion II Phase 1 & 1A
  • 2003 - North System Expansion
  • 2004 - South Sys Expansion II Phase 3
  • 2005 - Triangle Upgrade
  • 2007 - North Main Loop Replacement & Cypress 2007 Phase 1
  • 2008 - Cypress 2008 Phase 2
  • 2010 - South System Expansion III Phase 1
  • 2011 - South System Expansion III Phase 2
  • 2012 - South System Expansion III Phase 3


+++ Other Information

  • -

Links

  1. EIA Natural Gas Pipeline Projects
  2. Kinder Morgan, Southern Natural Gas
  3. Southern Natural's Cypress Pipeline Project