Difference between revisions of "Skikda Refinery Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Sonatrach Website: http://www.sonatrach-dz.com/ (French) Wiki Page: Skikda Refinery Location: Skikda, Algeria Capacity: Before: 7.5 million tons...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
Summary Information | Summary Information | ||
− | Ownership: Sonatrach | + | |
− | Website: http://www.sonatrach-dz.com/ (French) | + | * Ownership: Sonatrach |
− | Wiki Page: Skikda Refinery | + | * Website: http://www.sonatrach-dz.com/ (French) |
− | Location: Skikda, Algeria | + | * Wiki Page: [[Skikda Refinery]] |
− | Capacity: | + | * Location: Skikda, Algeria |
− | Before: 7.5 million tons/annum & 150,000 bbl/day | + | * Capacity: |
− | After: 16.5 million tons/annum & 330,000 bbl/day | + | ** Before: 7.5 million tons/annum & 150,000 bbl/day |
− | Nelson Complexity: | + | ** After: 16.5 million tons/annum & 330,000 bbl/day |
− | Project Stage: Under construction | + | * Nelson Complexity: |
− | Expected Completion: 2013 | + | * Project Stage: Under construction |
− | Budget: $2.6 Billion | + | * Expected Completion: [[Refinery Projects completed 2013 | 2013]] |
− | The Project | + | * Budget: $2.6 Billion |
− | Project Type: Major expansion and upgrade of an existing refinery | + | |
− | Project Summary: From the crude distillation unit to the aromatic facilities, the contract covers most of the refinery complex. Through its rehabilitation and modernization, the largest refinery plant in Algeria will have its refining capacity increased up to 330,000 BPSD. In addition, the contract includes new plants for the production of Isomerate (700,000 MTPA), Para-Xylene (220,000 MTPA) and Benzene (200,000 MTPA). | + | +++ The Project |
− | Main Contractors: | + | |
− | Samsung Engineering: will perform engineering, procurement and construction services on a lump-sum turn key contract basis, with bulk materials and construction costs to be settled on a reimbursable contract basis | + | * Project Type: Major expansion and upgrade of an existing refinery |
− | EIL: PMC services | + | * Project Summary: From the crude distillation unit to the aromatic facilities, the contract covers most of the refinery complex. Through its rehabilitation and modernization, the largest refinery plant in Algeria will have its refining capacity increased up to 330,000 BPSD. In addition, the contract includes new plants for the production of Isomerate (700,000 MTPA), Para-Xylene (220,000 MTPA) and Benzene (200,000 MTPA). |
− | Refining Units | + | * Main Contractors: |
− | Atmospheric Distillation | + | ** Samsung Engineering: will perform engineering, procurement and construction services on a lump-sum turn key contract basis, with bulk materials and construction costs to be settled on a reimbursable contract basis |
− | Isomerisation | + | ** EIL: PMC services |
− | Terminal Capacity | + | |
− | Crude Oil: | + | +++ Refining Units |
− | Refined Products: | + | |
− | Crude Supply | + | * Atmospheric Distillation |
− | Domestic Algerian Crude | + | * Isomerisation |
− | Products Produced | + | * |
− | - | + | |
− | History | + | +++ Terminal Capacity |
− | 2009 - Samsung Engineering awarded engineering, procurement and construction contract | + | |
− | Other Information | + | * Crude Oil: |
− | - | + | * Refined Products: |
− | Relevant Links | + | |
− | Samsung Engineering wins a 2.6 bn USD order from Algeria | + | +++ Crude Supply |
− | EIL Secures Project Management Consultancy Contract from NAFTEC, Algeria | + | |
− | Skikda Refinery Contract Awarded (French) | + | * Domestic Algerian Crude |
+ | |||
+ | |||
+ | +++ Products Produced | ||
+ | |||
+ | * - | ||
+ | |||
+ | +++ History | ||
+ | |||
+ | * 2009 - Samsung Engineering awarded engineering, procurement and construction contract | ||
+ | |||
+ | +++ Other Information | ||
+ | |||
+ | * - | ||
+ | |||
+ | |||
+ | +++ Relevant Links | ||
+ | |||
+ | * [http://killajoules.wikidot.com/archive:samsung-engineering-wins-a-2-6-bn-usd-order-from-alg Samsung Engineering wins a 2.6 bn USD order from Algeria] | ||
+ | * [http://www.engineersindia.com/Whats_New/naftec.htm EIL Secures Project Management Consultancy Contract from NAFTEC, Algeria ] | ||
+ | * [http://www.sonatrach-dz.com/NEW/V_English/com-press-23.html Skikda Refinery Contract Awarded] (French) |
Latest revision as of 16:10, 5 January 2024
Summary Information
- Ownership: Sonatrach
- Website: http://www.sonatrach-dz.com/ (French)
- Wiki Page: Skikda Refinery
- Location: Skikda, Algeria
- Capacity:
- Before: 7.5 million tons/annum & 150,000 bbl/day
- After: 16.5 million tons/annum & 330,000 bbl/day
- Nelson Complexity:
- Project Stage: Under construction
- Expected Completion: 2013
- Budget: $2.6 Billion
+++ The Project
- Project Type: Major expansion and upgrade of an existing refinery
- Project Summary: From the crude distillation unit to the aromatic facilities, the contract covers most of the refinery complex. Through its rehabilitation and modernization, the largest refinery plant in Algeria will have its refining capacity increased up to 330,000 BPSD. In addition, the contract includes new plants for the production of Isomerate (700,000 MTPA), Para-Xylene (220,000 MTPA) and Benzene (200,000 MTPA).
- Main Contractors:
- Samsung Engineering: will perform engineering, procurement and construction services on a lump-sum turn key contract basis, with bulk materials and construction costs to be settled on a reimbursable contract basis
- EIL: PMC services
+++ Refining Units
- Atmospheric Distillation
- Isomerisation
+++ Terminal Capacity
- Crude Oil:
- Refined Products:
+++ Crude Supply
- Domestic Algerian Crude
+++ Products Produced
- -
+++ History
- 2009 - Samsung Engineering awarded engineering, procurement and construction contract
+++ Other Information
- -
+++ Relevant Links