Difference between revisions of "Shymkent Refinery Upgrade Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 8: | Line 8: | ||
* Nelson Complexity: | * Nelson Complexity: | ||
* Project Stage: | * Project Stage: | ||
− | * Expected Completion: [[Refinery Projects | + | * Expected Completion: [[Refinery Projects completed 2017 | 2017]] |
* Budget: | * Budget: | ||
Line 53: | Line 53: | ||
* 2012 - Technip awarded contract for the front-end engineering design (FEED) services | * 2012 - Technip awarded contract for the front-end engineering design (FEED) services | ||
* 2014 - EPC signed for Naphtha Isomerization Unit with CPECC | * 2014 - EPC signed for Naphtha Isomerization Unit with CPECC | ||
+ | * 2017 - Upgrade project completed | ||
+++ Other Information | +++ Other Information | ||
Line 63: | Line 64: | ||
# [http://killajoules.wikidot.com/blog:3171 Technip awarded two contracts for refinery projects in Kazakhstan] | # [http://killajoules.wikidot.com/blog:3171 Technip awarded two contracts for refinery projects in Kazakhstan] | ||
# [http://killajoules.wikidot.com/blog:4914 Shymkent Refinery EPC contract signed] | # [http://killajoules.wikidot.com/blog:4914 Shymkent Refinery EPC contract signed] | ||
+ | # [https://abarrelfull.blogspot.com/2024/01/shymkent-refinery-will-move-to.html Shymkent refinery will move to the production of gasoline that meets Euro 4 and 5 in 2017] | ||
+ | |||
+ | [[category:Refinery]] | ||
+ | [[category:Kazakhstan]] | ||
+ | [[category:KazMunayGas]] |
Latest revision as of 16:00, 5 January 2024
Summary Information
- Ownership: Petrokazakhstan (CNPC) / KazMunaiGaz each have 50% stakes
- Website: http://www.petrokazakhstan.kz/
- Wiki Page: Shymkent Refinery
- Location: Shymkent, Southern Kazakhstan
- Capacity: 5.25 million tons/annum & 105,000 bbl/day
- Nelson Complexity:
- Project Stage:
- Expected Completion: 2017
- Budget:
+++ The Project
- Project Type:
- Project Summary:
- The goals of the Project are as follows:
- Increase the capacity of the refinery to 6 million tons;
- Increase the yield of light oil products from 61% to 89%
- Improve the quality of products to meet EURO-3 standard requirements;
- Expand the product slate by producing petrochemicals such as polypropylene, benzene and elemental sulfur;
- Reduce the output of effluent discharge;
- As part of the modernization project it is planned to build a catalytic cracker, gasoline hydrotreater, isomerization and absorption/gas fractionation units.
- Main Contractors:
- Technip: Front-end engineering design (FEED) services
- CPECC: Detailed engineering, procurement of equipment and materials and implementation of construction and installation work (EPC contract) for the Naphtha Isomerization Unit
- UOP: Isomerization Unit licence
+++ Refining Units
- Catalytic cracker
- Gasoline hydrotreater
- Isomerization
- Absorption/gas fractionation units
+++ Terminal Capacity
- Crude Oil:
- Refined Products:
+++ Crude Supply
- On completion of the project, it is planned to process 75% of Aktobe and 25% of Kumkol oil
+++ Products Produced
- -
+++ History
- 2012 - Technip awarded contract for the front-end engineering design (FEED) services
- 2014 - EPC signed for Naphtha Isomerization Unit with CPECC
- 2017 - Upgrade project completed