Shenzi Oil Pipeline
Jump to navigation
Jump to search
Summary Information
- Source: Shenzi Oil and Gas Field
- Destination: Ship Shoal 332B junction platform
- Ownership: Enterprise Products Partners
- Website: http://www.enterpriseproducts.com/
- Length: kilometres (83 miles)
- Capacity: 230,000 barrels of oil per day
- Crude Type:
+++ Brief Description
- The 83-mile, 20-inch diameter pipeline has the capacity to transport up to 230,000 barrels per day of crude oil and connects the Shenzi Oil and Gas Field to the Cameron Highway Oil Pipeline and Poseidon Oil Pipeline systems at Enterprise's Ship Shoal 332B junction platform
- The Kings Quay Oil and Gas Fields have also been connected to the system
+++ Pipeline Status
- In operation
+++ History
- 2006 - Shenzi Oil Pipeline project announced
- 2009 - Enterprise Begins Service on Shenzi Crude Oil Export Pipeline
- 2022 - First oil from Kings Quay
+++ Other Information
- -
+++ Links