Difference between revisions of "Shenzhen Diefu CNOOC LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
* Storage capacity: four 160,000 m3 LNG storage tanks | * Storage capacity: four 160,000 m3 LNG storage tanks | ||
* Unloading capacity: | * Unloading capacity: | ||
− | * Send out capacity: | + | * Send out capacity: 17 million cubic meters of natural gas per day |
* Constructor: | * Constructor: | ||
** TGE and Sinopec Ningbo Engineering Co: Turn-key project of four LNG full-capacity tanks | ** TGE and Sinopec Ningbo Engineering Co: Turn-key project of four LNG full-capacity tanks | ||
− | |||
− | |||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | * The terminal was commissioned in [[LNG Terminal Projects Completed in | + | * The terminal was commissioned in [[LNG Terminal Projects Completed in 2018 | 2018]] |
* An expansion is underway which should be completed in 2023 | * An expansion is underway which should be completed in 2023 | ||
Line 31: | Line 29: | ||
=== History === | === History === | ||
* 2012 - The National Development and Reform Commission approved construction of the terminal | * 2012 - The National Development and Reform Commission approved construction of the terminal | ||
− | * | + | * 2018 - The terminal was completed |
=== Other Information === | === Other Information === |
Latest revision as of 16:41, 7 January 2022
Contents
Summary Information
- Ownership: CNOOC
- Website: http://www.cnoocgas.com/
- Location: Guangdong, China
- Capacity: 4.0 million tons/annum
- Status: In operation
Brief Description
- Binhai LNG facility includes one jetty to accommodate 125,000-266,000 cubic meter LNG carrier and four 220,000 cubic meters LNG tanks
Technical Details
- Storage capacity: four 160,000 m3 LNG storage tanks
- Unloading capacity:
- Send out capacity: 17 million cubic meters of natural gas per day
- Constructor:
- TGE and Sinopec Ningbo Engineering Co: Turn-key project of four LNG full-capacity tanks
Ongoing Projects/Project Status
- The terminal was commissioned in 2018
- An expansion is underway which should be completed in 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2012 - The National Development and Reform Commission approved construction of the terminal
- 2018 - The terminal was completed
Other Information
- -