Difference between revisions of "Shenzhen Diefu CNOOC LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) m (Abarrelfull moved page Shenzhen Diefu CNOOC Lng Terminal to Shenzhen Diefu CNOOC LNG Terminal) |
Abarrelfull (talk | contribs) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: CNOOC | + | |
− | Website: http://www.cnoocgas.com/ | + | * Ownership: CNOOC |
− | CNOOC LNG Terminals | + | * Website: http://www.cnoocgas.com/ |
− | Location: | + | ** [[CNOOC LNG Terminals]] |
− | Capacity: 4.0 million tons/annum | + | * Location: Guangdong, China |
− | Status: | + | * Capacity: 4.0 million tons/annum |
− | Brief Description | + | * Status: In operation |
− | - | + | |
− | Technical Details | + | === Brief Description === |
− | Storage capacity: four 160,000 m3 LNG storage tanks | + | * Binhai LNG facility includes one jetty to accommodate 125,000-266,000 cubic meter LNG carrier and four 220,000 cubic meters LNG tanks |
− | Unloading capacity: | + | |
− | Send out capacity: | + | === Technical Details === |
− | Constructor: | + | * Storage capacity: four 160,000 m3 LNG storage tanks |
− | + | * Unloading capacity: | |
− | Ongoing Projects/Project Status | + | * Send out capacity: 17 million cubic meters of natural gas per day |
− | + | * Constructor: | |
− | Suppliers / Customers | + | ** TGE and Sinopec Ningbo Engineering Co: Turn-key project of four LNG full-capacity tanks |
− | Suppliers: | + | |
− | Customers: | + | === Ongoing Projects/Project Status === |
− | History | + | * The terminal was commissioned in [[LNG Terminal Projects Completed in 2018 | 2018]] |
− | 2012 - The National Development and Reform Commission approved construction of the terminal | + | * An expansion is underway which should be completed in 2023 |
− | Other Information | + | |
− | - | + | === Suppliers / Customers === |
− | + | * Suppliers: | |
− | Approval of CNOOC's Shenzhen Diefu liquefied natural gas project | + | * Customers: |
+ | |||
+ | |||
+ | === History === | ||
+ | * 2012 - The National Development and Reform Commission approved construction of the terminal | ||
+ | * 2018 - The terminal was completed | ||
+ | |||
+ | === Other Information === | ||
+ | * - | ||
+ | |||
+ | === Links === | ||
+ | # [http://killajoules.wikidot.com/blog:2894 Approval of CNOOC's Shenzhen Diefu liquefied natural gas project] |
Latest revision as of 16:41, 7 January 2022
Contents
Summary Information
- Ownership: CNOOC
- Website: http://www.cnoocgas.com/
- Location: Guangdong, China
- Capacity: 4.0 million tons/annum
- Status: In operation
Brief Description
- Binhai LNG facility includes one jetty to accommodate 125,000-266,000 cubic meter LNG carrier and four 220,000 cubic meters LNG tanks
Technical Details
- Storage capacity: four 160,000 m3 LNG storage tanks
- Unloading capacity:
- Send out capacity: 17 million cubic meters of natural gas per day
- Constructor:
- TGE and Sinopec Ningbo Engineering Co: Turn-key project of four LNG full-capacity tanks
Ongoing Projects/Project Status
- The terminal was commissioned in 2018
- An expansion is underway which should be completed in 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2012 - The National Development and Reform Commission approved construction of the terminal
- 2018 - The terminal was completed
Other Information
- -