Difference between revisions of "Shenzhen Diefu CNOOC LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
(6 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
* Website: http://www.cnoocgas.com/
 
* Website: http://www.cnoocgas.com/
 
** [[CNOOC LNG Terminals]]
 
** [[CNOOC LNG Terminals]]
* Location:
+
* Location: Guangdong, China
 
* Capacity: 4.0 million tons/annum  
 
* Capacity: 4.0 million tons/annum  
* Status: Planned
+
* Status: In operation
  
 
=== Brief Description ===
 
=== Brief Description ===
 
* Binhai LNG facility includes one jetty to accommodate 125,000-266,000 cubic meter LNG carrier and four 220,000 cubic meters LNG tanks
 
* Binhai LNG facility includes one jetty to accommodate 125,000-266,000 cubic meter LNG carrier and four 220,000 cubic meters LNG tanks
  
+++ Technical Details
+
=== Technical Details ===
 
* Storage capacity: four 160,000 m3 LNG storage tanks
 
* Storage capacity: four 160,000 m3 LNG storage tanks
 
* Unloading capacity:
 
* Unloading capacity:
* Send out capacity:  
+
* Send out capacity: 17 million cubic meters of natural gas per day
 
* Constructor:
 
* Constructor:
 
** TGE and Sinopec Ningbo Engineering Co: Turn-key project of four LNG full-capacity tanks
 
** TGE and Sinopec Ningbo Engineering Co: Turn-key project of four LNG full-capacity tanks
  
 +
=== Ongoing Projects/Project Status ===
 +
* The terminal was commissioned in [[LNG Terminal Projects Completed in 2018 | 2018]]
 +
* An expansion is underway which should be completed in 2023
  
 
+
=== Suppliers / Customers ===
+++ Ongoing Projects/Project Status
 
* Commissioning is expected in [[LNG Terminal Projects Completed in 2015 | 201X]]
 
 
 
+++ Suppliers / Customers
 
 
* Suppliers:  
 
* Suppliers:  
 
* Customers:  
 
* Customers:  
  
  
+++ History
+
=== History ===
 
* 2012 - The National Development and Reform Commission approved construction of the terminal
 
* 2012 - The National Development and Reform Commission approved construction of the terminal
 +
* 2018 - The terminal was completed
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  
 
=== Links ===
 
=== Links ===
 
# [http://killajoules.wikidot.com/blog:2894 Approval of CNOOC's Shenzhen Diefu liquefied natural gas project]
 
# [http://killajoules.wikidot.com/blog:2894 Approval of CNOOC's Shenzhen Diefu liquefied natural gas project]

Latest revision as of 16:41, 7 January 2022

Summary Information

Brief Description

  • Binhai LNG facility includes one jetty to accommodate 125,000-266,000 cubic meter LNG carrier and four 220,000 cubic meters LNG tanks

Technical Details

  • Storage capacity: four 160,000 m3 LNG storage tanks
  • Unloading capacity:
  • Send out capacity: 17 million cubic meters of natural gas per day
  • Constructor:
    • TGE and Sinopec Ningbo Engineering Co: Turn-key project of four LNG full-capacity tanks

Ongoing Projects/Project Status

  • The terminal was commissioned in 2018
  • An expansion is underway which should be completed in 2023

Suppliers / Customers

  • Suppliers:
  • Customers:


History

  • 2012 - The National Development and Reform Commission approved construction of the terminal
  • 2018 - The terminal was completed

Other Information

  • -

Links

  1. Approval of CNOOC's Shenzhen Diefu liquefied natural gas project