Difference between revisions of "Shelley Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Premier * Country: UK * Location: central North Sea * Production start: 2009 * Partners: * Type: Oil & Gas * Estimated Reserves: * Productio...") |
Abarrelfull (talk | contribs) |
||
Line 27: | Line 27: | ||
+++ Links | +++ Links | ||
− | # [[UK Oil | + | # [[UK Oil and Gas Field Approved Decommissioning Programmes]] |
# [http://killajoules.wikidot.com/archive:technip-awarded-frame-agreement-for-uk-north-sea-fie Technip awarded frame agreement for UK North Sea field developments] | # [http://killajoules.wikidot.com/archive:technip-awarded-frame-agreement-for-uk-north-sea-fie Technip awarded frame agreement for UK North Sea field developments] | ||
# [http://killajoules.wikidot.com/archive:shelley-first-oil Shelley first oil] | # [http://killajoules.wikidot.com/archive:shelley-first-oil Shelley first oil] |
Latest revision as of 07:31, 31 January 2024
Summary Information
- Operator: Premier
- Country: UK
- Location: central North Sea
- Production start: 2009
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field has been developed using two horizontal subsea production wells equipped with downhole electric submersible pumps.
- The wells are connected via a short flowline, and a control umbilical, to the Sevan Voyageur FPSO
+++ Contractors
- **Sevan Marine:** Supply of FPSO
- **Technip:** Engineering, installation and commissioning of pipelines, a control umbilical and jumpers(3), flexible risers(4), a subsea manifold and attendant flowline(5).
+++ History
- 1984 - The Shelley field was discovered
- 2008 - Project development approved by UK Government
- 2009 - First oil produced
- 2010 - Decommissioning approved
+++ Geology
+++ Links