Shelley Oil Field
Jump to navigation
Jump to search
Summary Information
- Operator: Premier
- Country: UK
- Location: central North Sea
- Production start: 2009
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field has been developed using two horizontal subsea production wells equipped with downhole electric submersible pumps.
- The wells are connected via a short flowline, and a control umbilical, to the Sevan Voyageur FPSO
+++ Contractors
- **Sevan Marine:** Supply of FPSO
- **Technip:** Engineering, installation and commissioning of pipelines, a control umbilical and jumpers(3), flexible risers(4), a subsea manifold and attendant flowline(5).
+++ History
- 1984 - The Shelley field was discovered
- 2008 - Project development approved by UK Government
- 2009 - First oil produced
- 2010 - Decommissioning approved
+++ Geology
+++ Links