Shell Pulau Bukom Refinery

From A Barrel Full
Revision as of 06:13, 9 March 2020 by Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Shell Website: http://www.shell.com/ List of Shell Refineries Location: Bukom, Singapore Capacity: 25 million tons/annum & 500,000 bbl/day Nelso...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information Ownership: Shell Website: http://www.shell.com/ List of Shell Refineries Location: Bukom, Singapore Capacity: 25 million tons/annum & 500,000 bbl/day Nelson Complexity: Shell Pulau Bukom Refinery

  • Image: Shell

Refining Units CDU 1, CDU 2, CDU 3, CDU 4:115,000 bpd, Total: 500,000 Hydrocracker: 34,000 bpd Fluidised Catalytic Cracker - 37,400 Long Residue Catalytic Cracking Unit: 5,300 Tons/day Platformer - 17,000 bpd Thermal cracker 33,000 bpd Visbreaker 33,000 bpd Gas oil Desulphurisation - 45,000 Alkylation Units - 3,800 Condensate splitter unit 70,000bpd Terminal Capacity Crude Oil: Refined Products: Crude Supply The refinery can handle a wide range of crude oil Products Produced Gasoline Ultra-low sulfur diesel Jet fuel Fuel Oil Ongoing Projects On March 24nd 2010, Shell announced that its new ethylene cracker had been started up successfully. The 100% Shell-owned ethylene cracker complex (ECC) has a capacity of 800,000 tonnes of ethylene per annum, as well as 450,000 tonnes of propylene and 230,000 tonnes of benzene. Shell Merichem technologies for a revamp project to treat Propane/Propylene, Butane/Butylene & Light Cat-Cracked Gasoline streams in order to meet final product specifications. Other Information Some 90 percent of Bukom's products are exported to countries in the region and beyond. History Shell set up Singapore’s first oil refinery in 1961 1972 - Sulfur Recovery Unit added 1990 - Fluid Catalytic Cracking Unit & Alkylation UnitCommissioned 1994 - Addition of platformer unit + gas oil desulphurisation unit(Chiyoda) 2000 - A condensate splitter of 70,000 bpd is commissioned (Chiyoda) 2007 - FCC revamp project started 2010 - FCC is revamped to 37,400 bpd (Chiyoda) 2012 - Gas Oil desulphurisation unit & sulphur block completed Relevant Links Chiyoda Fluid Catalytic Cracking Units Chiyoda Catalytic Reforming Units Chiyoda Alkylation Units Chiyoda Condensate Splitter Units Chiyoda Sulfur Recovery Units Chiyoda H2S Removal Units With Amine Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U Chiyoda Claus Tail Gas Treating Units Shell Singapore Energy Efficiency in Bukom pdf LRCC Efficiency Project Maintenance News 2009 Reuters Maintenance News 2007 Asia One Chiyoda Singapore Projects FIBER FILM® Contactor Technology Selected for Revamp Project in Shell Refinery in Singapore Chiyoda: Award of EPCm Contract for Pulau Bukom Refinery Long Residue Catalytic Cracking Unit Revamp Project in Singapore Fire in Pulau Bukom Manufacturing Site