Difference between revisions of "Shedgum Yanbu NGL pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: Shedgum * Destination: Yanbu * Ownership: Aramco * Website: * Length: kilometres ( miles) * Capacity: barrels of oil per day * Crud...")
 
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
 
* Ownership: Aramco
 
* Ownership: Aramco
 
* Website:  
 
* Website:  
* Length: kilometres ( miles)  
+
* Length: 1,166 kilometres ( miles)  
 
* Capacity:  barrels of oil per day  
 
* Capacity:  barrels of oil per day  
 
* Crude Type: NGLs
 
* Crude Type: NGLs
Line 11: Line 11:
 
=== Brief Description ===
 
=== Brief Description ===
  
* -
+
* The pipeline transports natural gas liquids (NGLs) from the [[Shedgum Gas Processing Plant]] on the gulf coast to the [[Yanbu NGL Plant]] on the Red Sea coast
  
 
=== Pipeline Status ===
 
=== Pipeline Status ===
Line 17: Line 17:
  
 
=== History ===
 
=== History ===
* -
+
* 2014 - Saipem awarded EPC contract for capacity expansion
  
 
=== Other Information ===
 
=== Other Information ===
Line 25: Line 25:
 
=== Links ===
 
=== Links ===
  
# -
+
# [https://abarrelfull.blogspot.com/2024/03/saipem-awarded-e-contracts-for.html Saipem awarded E&C contracts for approximately $4 billion]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:Saudi Arabia]]
 
[[category:Saudi Arabia]]
 
[[category:Saudi Aramco]]
 
[[category:Saudi Aramco]]

Latest revision as of 16:19, 11 March 2024

Summary Information

  • Source: Shedgum
  • Destination: Yanbu
  • Ownership: Aramco
  • Website:
  • Length: 1,166 kilometres ( miles)
  • Capacity: barrels of oil per day
  • Crude Type: NGLs

Brief Description

Pipeline Status

  • In operation

History

  • 2014 - Saipem awarded EPC contract for capacity expansion

Other Information

  • -

Links

  1. Saipem awarded E&C contracts for approximately $4 billion