Difference between revisions of "Shaheen Petrochemical Project"

From A Barrel Full
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
  
* Ownership:  
+
* Ownership: S-Oil (Saudi Aramco)
* Website:  
+
* Website: http://www.s-oil.com/
* Wikipage:  
+
* Wikipage: [[S-Oil Ulsan Refinery]]
* Location:  
+
* Location: Ulusan, South Korea
  
 
=== The Project ===
 
=== The Project ===
* Description:  
+
* Description: The project is located on the site of the [[S-Oil Ulsan Refinery]]. The new plant is planned to have the capacity to produce up to 3.2 million tons of petrochemicals annually and include a facility to produce high-value polymers
* Constructor:
+
* The plant will use TC2C technology, the first time it has been used commercially
 +
* Constructors:
 +
** Hyundai E&C consortium: Package 1 construction
 +
** DL E&C: TC2C construction
 
* Licensors:
 
* Licensors:
 +
** Aramco and Lummus Technology: TC2C technology
  
 
=== Production Units ===
 
=== Production Units ===
 
+
* TC2C Unit
 +
* Mixed feed steam crqcker
  
 
=== Raw Materials Supply ===
 
=== Raw Materials Supply ===
* -
+
* The plant will process residual products into naphtha
  
 
=== Products Produced ===
 
=== Products Produced ===
Line 25: Line 30:
  
 
=== History ===
 
=== History ===
 +
* 2022 - Project launched
 
* 2023 - Groundbreaking ceremony held for the project
 
* 2023 - Groundbreaking ceremony held for the project
  
 
=== Links ===
 
=== Links ===
 
# [https://abarrelfull-of-petrochemicals.blogspot.com/2023/03/south-korean-president-and-aramco-ceo.html South Korean President and Aramco CEO attend S-OIL’s $7bn Shaheen groundbreaking]
 
# [https://abarrelfull-of-petrochemicals.blogspot.com/2023/03/south-korean-president-and-aramco-ceo.html South Korean President and Aramco CEO attend S-OIL’s $7bn Shaheen groundbreaking]
 +
# [https://abarrelfull-of-petrochemicals.blogspot.com/2023/03/dl-e-participates-in-its-largest.html DL E&C Participates in its Largest Petrochemical Project Ever]
 +
# [https://abarrelfull.blogspot.com/2023/03/unique-crude-to-chemicals-technology.html Unique Crude-to-Chemicals Technology Set to Deploy in First Commercial Development]
  
 
[[category:Petrochemical]]
 
[[category:Petrochemical]]
 
[[category:South Korea]]
 
[[category:South Korea]]
 
[[category:Saudi Aramco]]
 
[[category:Saudi Aramco]]
 +
[[Category:S-Oil]]

Latest revision as of 12:26, 22 March 2023

Summary Information

The Project

  • Description: The project is located on the site of the S-Oil Ulsan Refinery. The new plant is planned to have the capacity to produce up to 3.2 million tons of petrochemicals annually and include a facility to produce high-value polymers
  • The plant will use TC2C technology, the first time it has been used commercially
  • Constructors:
    • Hyundai E&C consortium: Package 1 construction
    • DL E&C: TC2C construction
  • Licensors:
    • Aramco and Lummus Technology: TC2C technology

Production Units

  • TC2C Unit
  • Mixed feed steam crqcker

Raw Materials Supply

  • The plant will process residual products into naphtha

Products Produced

  • -


Other Information

  • -

History

  • 2022 - Project launched
  • 2023 - Groundbreaking ceremony held for the project

Links

  1. South Korean President and Aramco CEO attend S-OIL’s $7bn Shaheen groundbreaking
  2. DL E&C Participates in its Largest Petrochemical Project Ever
  3. Unique Crude-to-Chemicals Technology Set to Deploy in First Commercial Development