Difference between revisions of "Shah Gas Processing Plant"

From A Barrel Full
Jump to navigation Jump to search
Line 7: Line 7:
  
 
=== Brief Description ===
 
=== Brief Description ===
* -
+
* The largest sour gas plant in the world, the Shah Gas plant can now process 1.45 billion standard cubic feet per day. It was originally designed to process 1.0 billion standard cubic feet per day.
  
 
=== Related Oil and Gas Fields ===
 
=== Related Oil and Gas Fields ===
 
* [[Shah Gas Field]]
 
* [[Shah Gas Field]]
  
=== Ongoing Projects ===
+
=== Projects ===
* -
+
* An expansion project was completed in 2023, that increased capacity from 1.28 to 1.45 billion standard cubic feet per day
  
 
=== Other Information ===
 
=== Other Information ===
Line 19: Line 19:
  
 
=== History ===
 
=== History ===
* -
+
* 2014 - Plant began operations
 +
* 2021 - Saipem awarded expansion project
  
 
===  Links ===
 
===  Links ===
# [ ]
+
# [https://abarrelfull.blogspot.com/2024/03/saipem-new-contract-awarded-by-abu.html Saipem: new contract awarded by the Abu Dhabi National Oil Company (ADNOC) for the Shah Gas plant in the United Arab Emirates]
  
 
[[category:Processing]]
 
[[category:Processing]]
 
[[category:UAE]]
 
[[category:UAE]]
 
[[category:ADNOC]]
 
[[category:ADNOC]]

Revision as of 17:36, 3 March 2024

Summary Information

  • Ownership:
  • Website:
  • Location:
  • Capacity:

Brief Description

  • The largest sour gas plant in the world, the Shah Gas plant can now process 1.45 billion standard cubic feet per day. It was originally designed to process 1.0 billion standard cubic feet per day.

Related Oil and Gas Fields

Projects

  • An expansion project was completed in 2023, that increased capacity from 1.28 to 1.45 billion standard cubic feet per day

Other Information

  • -

History

  • 2014 - Plant began operations
  • 2021 - Saipem awarded expansion project

Links

  1. Saipem: new contract awarded by the Abu Dhabi National Oil Company (ADNOC) for the Shah Gas plant in the United Arab Emirates