Difference between revisions of "Serrette Gas Field"

From A Barrel Full
Jump to navigation Jump to search
 
Line 5: Line 5:
 
* Production start: 2011
 
* Production start: 2011
 
* Partners: Repsol
 
* Partners: Repsol
* Type: Oil / Gas
+
* Type: Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
 
* Production Volume:  
 
* Production Volume:  
Line 27: Line 27:
 
* 2009 - Investment decision taken
 
* 2009 - Investment decision taken
 
* 2011 - First gas produced
 
* 2011 - First gas produced
 +
* 2017 - McDermott awarded Angelin contract
 
* 2019 - The Angelin platform starts production
 
* 2019 - The Angelin platform starts production
  
Line 36: Line 37:
 
# [http://killajoules.wikidot.com/archive:fugro-awarded-bp-trinidad-tobago-contract Fugro Awarded BP Trinidad & Tobago Contract]
 
# [http://killajoules.wikidot.com/archive:fugro-awarded-bp-trinidad-tobago-contract Fugro Awarded BP Trinidad & Tobago Contract]
 
# [http://killajoules.wikidot.com/blog:1216 BPTT begins Gas Production from Serrette]
 
# [http://killajoules.wikidot.com/blog:1216 BPTT begins Gas Production from Serrette]
 +
# [https://abarrelfull.blogspot.com/2024/02/mcdermott-awarded-angelin-epcic.html McDermott Awarded Angelin EPCIC Contract from BP Trinidad & Tobago]
 
# [https://abarrelfull.blogspot.com/2024/02/bp-starts-gas-production-from-trinidad.html BP starts gas production from Trinidad and Tobago’s Angelin project]
 
# [https://abarrelfull.blogspot.com/2024/02/bp-starts-gas-production-from-trinidad.html BP starts gas production from Trinidad and Tobago’s Angelin project]
  

Latest revision as of 08:54, 21 February 2024

Summary Information

  • Operator: BP
  • Country: Trinidad And Tobago
  • Location: Block Samaan, off the east coast of Trinidad
  • Production start: 2011
  • Partners: Repsol
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Serrette is located in 280 feet (90 metres) of water off Trinidad's south east coast
  • Serrette is a normally unmanned installation (NUI)
  • Production from Serrette is tied into bpTT's Cassia B hub via a 26-inch diameter, 32-mile long pipeline
  • Production from this facility supplies the domestic market and the Atlantic LNG Terminal
  • The Angelin development includes an unmanned platform and four wells and is tied back to the Serrette platform

Contractors

  • Fluor Summit Engineering: Design of Production facility
  • Trinidad Offshore Fabricators (TOFCO): Construction of installation
  • Fugro: Pipeline laying

Angelin

  • McDermott: Pre-FEED, FEED, Front-End Execution Planning & Detailed Engineering

History

  • 2009 - Investment decision taken
  • 2011 - First gas produced
  • 2017 - McDermott awarded Angelin contract
  • 2019 - The Angelin platform starts production

Geology

Links

  1. TOFCO Platform References
  2. Fugro Awarded BP Trinidad & Tobago Contract
  3. BPTT begins Gas Production from Serrette
  4. McDermott Awarded Angelin EPCIC Contract from BP Trinidad & Tobago
  5. BP starts gas production from Trinidad and Tobago’s Angelin project